FIR02-00253
| INSP-Final Inspection | 8/15/2002 | 8/16/2002 | 8/16/2002 12:00:00 AM | A | PART |
|
|
Fire alarm system given a temporary occupancy until the layin ceiling tile is installed which will eliminate the beam pockets and the requirement for smoke detectors in each one. This work will be done no later than Oct 1 2003 per letter agreed upon by Dave Miller with the Boise Fire Dept 8/16/2002 10:20:32 AM
|
FIR02-00211
| INSP-Final Inspection | 8/15/2002 | 8/16/2002 | 8/16/2002 12:00:00 AM | P | FAIL |
|
|
flow of water did not activate the inside horn or the outside alarm bell, still need to test the 4" butterfly vavle 8/16/2002 2:39:52 PM
|
BLD02-01188
| FIRE-Final Inspection | 8/15/2002 | 8/16/2002 | 8/16/2002 12:00:00 AM | P | FAIL |
|
|
remove thumbturn and key hardware from the ware house door, provide additional fire extinguisher in warehouse, finish connection of duct smoke detectors. Dave Miller gave permission for temp occ as long as fire alarm plans had been submitted 8/16/2002 2:31:24 PM
|
BLD02-01188
| FIRE-Supply Line Hydro | 8/15/2002 | 8/16/2002 | 8/16/2002 12:00:00 AM | P | CANC |
|
|
duplicate inspection 8/16/2002 1:49:36 PM 8/16/2002 1:50:01 PM
|
BLD02-01188
| FIRE-Alarm Testing | 8/15/2002 | 8/16/2002 | 8/16/2002 12:00:00 AM | P | CANC |
|
|
duplicate inspection 8/16/2002 1:49:44 PM
|