Inspections for the day of: Tuesday, August 16, 2005.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC05-00514 Site Preparation8/16/20058/16/20058/16/2005 3:31:52 PMPFAIL
Need signage, empty trash boxes etc.
ESC05-00515 Site Preparation8/16/20058/16/20058/16/2005 3:30:12 PMPFAIL
Correction to rp; signage needed, empty trash boxes, etc. Complete by noon on 8/18/05
ESC05-00513 Site Preparation8/16/20058/16/20058/16/2005 3:27:48 PMPFAIL
Need signage, trash boxes emptied. Complete by noon on 8/18/05.
ESC04-01409 Site Preparation8/16/20058/16/20058/16/2005 3:01:52 PMPPART
Overall looks good, minor trash debris not containerized.
ESC05-00967 Site Preparation8/16/20058/16/20058/16/2005 2:53:32 PMPFAIL
correction to rp; no signage, no other general bmps observed on construction site.
ESC05-00966 Site Preparation8/16/20058/16/20058/16/2005 2:51:21 PMPFAIL
Correction to rp; no signage, no other bmp observed at job site.
ESC05-00905 Site Preparation8/16/20058/16/20058/16/2005 2:44:25 PMPPASS
ESC05-00269 Site Preparation8/16/20058/16/20058/16/2005 12:00:00 AMPPART
D.I was protected, need to post signage and reduce concrete cutting residual.
ESC03-00675 Site Final8/16/20058/16/20058/16/2005 12:00:00 AMPPASS