MEC06-01230
| Final | 8/16/2006 | 8/16/2006 | 8/16/2006 4:27:07 PM | P | PASS |
|
|
###-#### - dedrea
|
MEC06-02674
| Pressure Test | 8/16/2006 | 8/16/2006 | 8/16/2006 4:15:31 PM | P | PASS |
|
|
steve - insulation sprayed on bottom of roof sheeting ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley...20lb ok
|
MEC06-02674
| Rough-in | 8/16/2006 | 8/16/2006 | 8/16/2006 3:16:33 PM | P | PASS |
|
|
steve - insulation sprayed on bottom of roof sheeting ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
MEC06-02420
| Rough-in | 8/15/2006 | 8/16/2006 | 8/16/2006 2:27:57 PM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS
|
MEC06-02420
| Pressure Test | 8/15/2006 | 8/16/2006 | 8/16/2006 2:26:57 PM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS
|
MEC06-02200
| Final | 8/15/2006 | 8/16/2006 | 8/16/2006 1:50:56 PM | A | PART |
|
|
###-#### call mike before you go
|
MEC06-02660
| Final | 8/15/2006 | 8/16/2006 | 8/16/2006 12:39:11 PM | A | PART |
|
|
JOB CONTACT: CHRIS BUSS ###-####; Phone #: ###-#### Internet Inspection Request from: JENN STALEY..no gas test required as stub outs to equipment were installed on shell and core. i will check the gas flex connections and regs on building final
|
MEC06-00682
| Rough-in | 8/15/2006 | 8/16/2006 | 8/16/2006 9:45:14 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 8/15/2006 at 4:00:49 PM. Contact: ###-####...ok to cover 3rd floor ceiling
|