Inspections for the day of: Thursday, August 16, 2007.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR07-00482 INSP-Final Inspection8/10/20078/16/20078/16/2007 4:30:02 PMPNR
Need completion of the OH hydrostatic tests and related riser supervision testing prior to final.
FIR07-00482 INSP-Sprinkler Rough-in/Hydro8/10/20078/16/20078/16/2007 4:28:03 PMPPART
Verified corrections noted at the previous inspection have been completed, hydrostatic testing failed due to pressures below 200 psi at the guages.
FIR06-00007 INSP-Final Inspection8/14/20078/16/20078/16/2007 4:00:16 PMAPART
Retested items on the first floor in need of correction, doors need adjusted at the service elevator lobby, missing a HD for the elevator machine room, two SD at the link relocated while on site, several items remain to be tested at the 2nd floor.
FIR07-00643 INSP-Sprinkler Rough-in/Hydro8/15/20078/16/20078/16/2007 3:54:46 PMAFAIL
Heads at several locations including along the west wall of the sales floor exceed maximum allowed spacing for OH group 2 as designed. The hydrostatic test passed.
BLD07-01426 FIRE-Final Inspection8/15/20078/16/20078/16/2007 12:58:47 PMACANC
Overbooked, no time available to complete this inspection today.
FIR07-00233 INSP-Sprinkler Rough-in8/15/20078/16/20078/16/2007 12:56:34 PMPCANC
Overbooked, no time available for this inspection today.
FIR07-00603 INSP-Final Inspection8/15/20078/16/20078/16/2007 12:55:54 PMACANC
Overbooked, no time available for this inspection today.
FIR07-00603 INSP-Sprinkler Rough-in8/15/20078/16/20078/16/2007 12:55:11 PMACANC
Overbooked, no time available for this inspection today.
FIR06-00540 INSP-Sprinkler Rough-in/Hydro8/15/20078/16/20078/16/2007 12:53:53 PMAPART
OH inspection for the 4th floor SW quadrant including the kitchen, cafeteria, eating areas, hallway and dining room as marked on approved plans are okay for ceiling cover. Hydrostatic testing for this area to be completed in conjunction with the next pahase of this floor. Also discussed scheduling for the basement seismic upgrades.
FIR07-00657 INSP-Final Inspection8/15/20078/16/20078/16/2007 12:48:53 PMAPASS
Fire sprinkler TI work passed final inspection.
FIR07-00462 INSP-Sprinkler Rough-in/Hydro8/15/20078/16/20078/16/2007 12:47:59 PMAPART
Fire alarm work completed satisfactory, alarm testing passed, however the preaction riser failed to function properly during testing.
FIR07-00474 INSP-Final Inspection8/15/20078/16/20078/16/2007 12:46:04 PMAFAIL
Scope of work is not yet complete, the preaction riser failed to function properly.