Inspections for the day of: Thursday, August 16, 2007.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR07-00386 FIR-Aging Inspection8/16/20078/16/20078/24/2007 10:35:51 AM NR
work is in progress
BLD06-03127 FIRE-Final Inspection8/15/20078/16/20078/17/2007 9:56:19 AMPPART
life safety passed
FIR07-00570 INSP-Final Inspection8/15/20078/16/20078/17/2007 9:08:02 AMPPASS
permit finaled
BLD05-03469 FIRE-Final Inspection8/16/20078/16/20078/16/2007 3:59:28 PMPPART
A temporary occupancy was given until the gas meter has been set and the duct smoke detectors can be tested. A condition of the temporary is that the hvac units not be used. I witnessed the power supply to both units being disabled.
BLD07-00271 FIRE-Final Inspection8/16/20078/16/20078/16/2007 3:56:35 PMPCANC
This inspection was performed and passed yesterday.
BLD07-00288 FIRE-Final Inspection8/15/20078/16/20078/16/2007 3:35:50 PMPPASS
LIfe safety passed.
FIR07-00283 INSP-Final Inspection8/16/20078/16/20078/16/2007 2:39:12 PMPPASS
permit finaled
BLD06-02647 FIRE-Final Inspection8/15/20078/16/20078/16/2007 1:56:29 PMAPASS
Life safety passed. There is no gas to the hvac units therefore the duct smoke detectors were not tested. They will need to be tested during the tenant buildout which the contractor/builder understands.
FIR07-00624 INSP-Final Inspection8/16/20078/16/20078/16/2007 12:51:48 PMPCANC
The sprinkler fitter needs additional time to complete the work. He is going to reschedule for tomorrow. No inspection performed.
FIR07-00624 INSP-Sprinkler Rough-in8/16/20078/16/20078/16/2007 12:51:18 PMPCANC
The sprinkler fitter needs additional time to complete the work. He is going to reschedule for tomorrow. No inspection performed.
BLD07-00873 FIRE-Final Inspection8/16/20078/16/20078/16/2007 12:46:32 PMAFAIL
There is an access controled egress door at the main exit (big door magnet). This device has not been connected to the fire alarm system. A permit will be required for this work. Also the request to exit button is by the receptionist and exceeds 5' from the door.
BLD07-01417 FIRE-Final Inspection8/15/20078/16/20078/16/2007 12:42:37 PMAFAIL
The existing exit sign for the corridor exit did not switch to battery backup and will need repaired. All other items appeared ok.
BLD07-00598 FIRE-Final Inspection8/16/20078/16/20078/16/2007 11:44:51 AMPFAIL
No approved plans on site and the contractor was not answering his phone.
FIR05-00536 INSP-Sprinkler Rough-in/Hydro8/15/20078/16/20078/16/2007 11:24:06 AMAPASS
Third floor hydro test passed
BLD07-00836 FIRE-Final Inspection8/15/20078/16/20078/16/2007 11:23:35 AMAFAIL
Repair the exit sign over the main door and provide the double door as discussed so that hardware can be verified.
FIR07-00646 INSP-Final Inspection8/15/20078/16/20078/16/2007 9:51:06 AMAPASS
Permit is finaled
BLD07-00491 FIRE-Final Inspection8/16/20078/16/20078/16/2007 9:07:34 AMPFAIL
Per the approved plans there is supposed to be a fire alarm permit for the new duct detector. Per mike timmerman there isn't any applied for yet and per the custodian the permanant doors are not installed yet.
FIR07-00642 INSP-Final Inspection8/15/20078/16/20078/16/2007 8:43:15 AMAFAIL
This inspection was just for the electronics area and for part of the womens clothing department. See the city approved plans for the exact locations.