BLD07-01399
| BLD-Final | 8/16/2007 | 8/16/2007 | 8/17/2007 12:42:39 PM | P | CANC |
|
|
Wayne; Phone #: ###-#### Internet Inspection Request from: Hattie James
|
BLD07-01398
| BLD-Final | 8/16/2007 | 8/16/2007 | 8/17/2007 12:42:25 PM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 8/16/2007 at 8:39:39 AM. Contact: ###-####.
|
BLD07-01401
| BLD-Final | 8/16/2007 | 8/16/2007 | 8/17/2007 12:42:09 PM | P | CANC |
|
|
Wayne; Phone #: ###-#### Internet Inspection Request from: Hattie James
|
BLD07-01400
| BLD-Final | 8/16/2007 | 8/16/2007 | 8/17/2007 12:41:53 PM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 8/16/2007 at 8:40:56 AM. Contact: ###-####.
|
BLD07-01402
| BLD-Final | 8/16/2007 | 8/16/2007 | 8/17/2007 12:41:34 PM | P | CANC |
|
|
Wayne; Phone #: ###-#### Internet Inspection Request from: Hattie James
|
BLD07-01920
| BLD-Footing | 8/15/2007 | 8/16/2007 | 8/16/2007 2:14:30 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 8/15/2007 at 4:14:35 PM. Contact: ###-####.
|
BLD07-01075
| BLD-Framing/Rough-in | 8/16/2007 | 8/16/2007 | 8/16/2007 1:55:36 PM | P | PART |
|
|
ceiling fire wall; Jeff; Phone #: ###-#### Internet Inspection Request from: Hattie James. interior soffitt. Framed with steel studs and fireblocked at 10ft. horizontally. Noted that conduits were not firecaulked, no tech data has been supplied. CXontractor to fircalk from attic side if applicable.
|
BLD07-01095
| BLD-Wall cover | 8/16/2007 | 8/16/2007 | 8/16/2007 1:35:50 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 8/16/2007 at 11:04:12 AM. Contact: ###-####. Interior framed walls.
|
BLD05-00917
| BLD-Final | 8/15/2007 | 8/16/2007 | 8/16/2007 11:21:08 AM | A | NR |
|
|
Michelle; please call for access; Phone #: ###-#### Internet Inspection Request from: Hattie James. Owner not home. occupant did not know anything about insp. Will have to reschedule.
|
BLD07-01934
| BLD-Foundation | 8/15/2007 | 8/16/2007 | 8/16/2007 11:07:20 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 8/15/2007 at 7:50:06 PM. Contact: ###-####.
|
BLD07-01800
| BLD-Foundation | 8/15/2007 | 8/16/2007 | 8/16/2007 11:07:01 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 8/15/2007 at 7:51:22 PM. Contact: ###-####.
|
BLD07-01935
| BLD-Foundation | 8/15/2007 | 8/16/2007 | 8/16/2007 11:06:40 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 8/15/2007 at 7:50:49 PM. Contact: ###-####.
|
BLD07-01668
| BLD-Final | 8/15/2007 | 8/16/2007 | 8/16/2007 10:59:14 AM | A | PASS |
|
|
John ###-####
|
BLD07-01668
| DOC - Permit Finaled | 8/16/2007 | 8/16/2007 | 8/16/2007 10:59:03 AM | P | PASS |
|
|
|
BLD06-02950
| BLD-Framing/Rough-in | 8/15/2007 | 8/16/2007 | 8/16/2007 10:35:46 AM | A | FAIL |
|
|
Needs to resubmit plans to plan review for reflected changes in breakroom for future mezz. Noted type 2b const, no combustibles allowed. Non rated osb was used for shear walls for future mezz. Contractor to provide UL specs for thru penetrations and smoke and flame spread data for insul barrier at ceiling. Also noted were added shear wall was installed from floor elev. to 10ft is 1hr wall, utilizing 2 different UL designs on 1 wall? All other interior framed walls ok pending elec.
|