PLM11-00546
| Sprinkler (Final) | 8/16/2011 | 8/16/2011 | 8/16/2011 4:13:12 PM | A | PASS |
|
|
|
MEC11-02546
| Final | 8/15/2011 | 8/16/2011 | 8/16/2011 3:49:53 PM | P | PASS |
|
|
contact Kenny @ ###-#### or Kelly @ ###-#### or Kevin @ Phone #: ###-#### >> Inspection requested via web by Kevin Pratley
|
MEC11-02406
| Rough-in | 8/15/2011 | 8/16/2011 | 8/16/2011 3:13:40 PM | P | FAIL |
|
|
Rough in and duct test at 2PM Phone #: ###-#### >> Inspection requested via web by Bill Burch duct blaster test ok, resubmit ACCA report addressing1) orientation 2) added register at slider 3) equipment selection, installed 70,000 furnace and a 24 coil.
|
PLM11-01624
| Plumbing Rough-in | 8/15/2011 | 8/16/2011 | 8/16/2011 3:09:02 PM | P | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Craig Johnson
|
MEC11-02314
| Final | 8/15/2011 | 8/16/2011 | 8/16/2011 1:34:26 PM | A | PASS |
|
|
PLease call with any questions or concerns. Please call Andy ###-#### on your way out.. Thank you Phone #: ###-#### >> Inspection requested via web by Jennifer Roy
|
MEC11-02530
| Final | 8/15/2011 | 8/16/2011 | 8/16/2011 1:07:02 PM | A | PART |
|
|
Call ahead to Don = homeowner for entry @ ###-####. Call Eric @ ###-#### with any installation issues/questions. Phone #: ###-#### >> Inspection requested via web by Angie maguire furnace ok pipe water heater t&p line to the floor
|