FIR11-00200
| INSP-Final Inspection | 8/16/2011 | 8/16/2011 | 8/17/2011 2:19:32 PM | A | PASS |
|
|
Fire alarm permit finaled.
|
FIR08-00239
| INSP-Sprinkler Rough-in/Hydro | 8/16/2011 | 8/16/2011 | 8/16/2011 4:29:01 PM | P | PART |
|
|
Overhead hydrostatic testing for building #2 2nd, 3rd, and 4th floor wet systems passsed.
|
FIR11-00267
| INSP-Final Inspection | 8/15/2011 | 8/16/2011 | 8/16/2011 3:28:50 PM | P | DEFR |
|
|
scott Phone #: ###-####
|
BLD11-00125
| FIRE-Conference | 8/15/2011 | 8/16/2011 | 8/16/2011 3:27:20 PM | A | DONE |
|
|
We are getting ready to open the wall between the two halves of the building. I would like to have you take a look around to see if we missed anything. Once the new bathrooms are being used, we will go in and remove the old bathrooms, office and stage. This is kind of a partial final inspection I guess. Thanks. Scott Phone #: ###-#### >> Inspection requested via web by Scott Asin
|
BLD11-01862
| FIRE-Final Inspection | 8/15/2011 | 8/16/2011 | 8/16/2011 8:19:14 AM | A | PASS |
|
|
C/N items verified for completion. Life safety inspection passed.
|