Inspections for the day of: Friday, August 16, 2013.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR13-00204 INSP-Sprinkler Rough-in/Hydro8/14/20138/16/20138/16/2013 3:50:44 PMPPASS
The overhead hydro test passed
BLD13-01201 FIRE-Final Inspection8/16/20138/16/20138/16/2013 3:45:33 PMPCANC
Per Nick this will be rescheduled for monday morning . Phone #: ###-####
FIR13-00293 INSP-Final Inspection8/15/20138/16/20138/16/2013 3:06:43 PMPPASS
Permit finaled
BLD13-01201 FIRE-Final Inspection8/16/20138/16/20138/16/2013 12:53:42 PMAFAIL
Provide exit signs at the two east warehouse doors. Repair the other exit signs and emergency lights and provide testing. Provide single action hardware on the southeast warehouse exit door.
FIR13-00182 INSP-Alarm Testing8/14/20138/16/20138/16/2013 12:51:15 PMADONE
Items needing correction for a final sign off on this permit are to increase the candella of select corridor strobes to provide coverage at the second floor stairwells and provide coverage as dicussed at the double doors where strobe coverage exceeds 15'. Also need to set off horn/strobes to verify functionality and sync.