FIR13-00204
| INSP-Sprinkler Rough-in/Hydro | 8/14/2013 | 8/16/2013 | 8/16/2013 3:50:44 PM | P | PASS |
|
|
The overhead hydro test passed
|
BLD13-01201
| FIRE-Final Inspection | 8/16/2013 | 8/16/2013 | 8/16/2013 3:45:33 PM | P | CANC |
|
|
Per Nick this will be rescheduled for monday morning . Phone #: ###-####
|
FIR13-00293
| INSP-Final Inspection | 8/15/2013 | 8/16/2013 | 8/16/2013 3:06:43 PM | P | PASS |
|
|
Permit finaled
|
BLD13-01201
| FIRE-Final Inspection | 8/16/2013 | 8/16/2013 | 8/16/2013 12:53:42 PM | A | FAIL |
|
|
Provide exit signs at the two east warehouse doors. Repair the other exit signs and emergency lights and provide testing. Provide single action hardware on the southeast warehouse exit door.
|
FIR13-00182
| INSP-Alarm Testing | 8/14/2013 | 8/16/2013 | 8/16/2013 12:51:15 PM | A | DONE |
|
|
Items needing correction for a final sign off on this permit are to increase the candella of select corridor strobes to provide coverage at the second floor stairwells and provide coverage as dicussed at the double doors where strobe coverage exceeds 15'. Also need to set off horn/strobes to verify functionality and sync.
|