BLD15-02707
| BLD-Concrete | 8/16/2016 | 8/16/2016 | 8/16/2016 5:03:18 PM | P | DEFR |
|
|
Level 5 pour 2 (north 1/2) PT deck. SI has been on site and is scheduled for today. Structural Engineer is scheduled to visit this afternoon. Concrete is schedule for 12:00 am 8/17 SI is scheduled to attend pour. Phone #: ###-#### Inspection requested via web by Jim Williams. No time. Specail inspector on site.
|
BLD14-03207
| BLD-Conference | 8/16/2016 | 8/16/2016 | 8/16/2016 5:02:39 PM | P | PART |
|
|
PM inspection walk. Items TBD. Call Adam when heading to site, ###-####. Thanks, AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson. Ok to one side stair enclosure, level 1 t0 4. Vapor level 2 ok, level 2 soffits ok. Level 4 and level 5 fire stop on elevator shafts, interior side ok.
|
BLD14-02889
| BLD-Framing/Rough-in | 8/16/2016 | 8/16/2016 | 8/16/2016 4:34:23 PM | P | PASS |
|
|
Lobby framing inspection Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD16-01642
| BLD-Conference | 8/16/2016 | 8/16/2016 | 8/16/2016 2:54:55 PM | P | DONE |
|
|
Jim Phone #: ###-####
|
BLD15-03282
| BLD-Final | 8/16/2016 | 8/16/2016 | 8/16/2016 2:16:50 PM | P | PASS |
|
|
Call 20 mins before // Hans Phone #: ###-####
|
BLD15-03282
| DOC - Permit Finaled | 8/16/2016 | 8/16/2016 | 8/16/2016 2:16:40 PM | P | PASS |
|
|
|
BLD16-02388
| BLD-Final | 8/16/2016 | 8/16/2016 | 8/16/2016 1:37:43 PM | P | FAIL |
|
|
Mfg. Home final. Please contact Ashleigh at ###-#### to meet. Thanks! Phone #: ###-#### Inspection requested via web by Ashleigh Meligan. Provide code compliant landings at exterior stairs.
|
ESC16-00510
| Site Final | 8/16/2016 | 8/16/2016 | 8/16/2016 1:22:13 PM | P | DONE |
|
|
|
ESC16-00510
| DOC - Permit Finaled | 8/16/2016 | 8/16/2016 | 8/16/2016 1:22:04 PM | P | PASS |
|
|
|
BLD16-01267
| BLD-Final | 8/16/2016 | 8/16/2016 | 8/16/2016 1:21:47 PM | P | PASS |
|
|
Tom Phone #: ###-####
|
BLD16-01267
| DOC - Permit Finaled | 8/16/2016 | 8/16/2016 | 8/16/2016 1:21:27 PM | P | PASS |
|
|
|
BLD15-03423
| BLD-Framing/Rough-in | 8/15/2016 | 8/16/2016 | 8/16/2016 11:33:13 AM | A | DONE |
|
|
Framing for the 3rd floor. Phone #: ###-#### Inspection requested via web by Carl Benjamin. Went over rated construction with contractor.
|
BLD16-02487
| BLD-Conference | 8/15/2016 | 8/16/2016 | 8/16/2016 11:11:51 AM | A | DONE |
|
|
Please contact Ami Tracy to walk thru. Phone #: ###-#### Inspection requested via web by Ami Tracy
|
BLD16-00727
| BLD-Framing/Rough-in | 8/15/2016 | 8/16/2016 | 8/16/2016 11:11:34 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by kevin debelloy
|
BLD15-03329
| BLD-Framing/Rough-in | 8/15/2016 | 8/16/2016 | 8/16/2016 9:38:33 AM | A | PASS |
|
|
Nathan Phone #: ###-####. 1st and 2nd. floor exterior steel stud framed walls ok to cover exterior side only.
|
BLD16-02917
| BLD-Final | 8/12/2016 | 8/16/2016 | 8/16/2016 8:48:06 AM | A | PASS |
|
|
Nick Phone #: ###-####
|