BLD16-00161
| FIRE-Final Inspection | 8/15/2017 | 8/16/2017 | 8/16/2017 3:18:12 PM | P | CANC |
|
|
Need the project related fire sprinkler permit addressed prior to a life safety.
Ron Phone #: ###-####
|
BLD16-02899
| FIRE-Conference | 8/15/2017 | 8/16/2017 | 8/16/2017 3:14:18 PM | A | DONE |
|
|
Herb, myself and Mike Jordan did a courtesy walk through one the north and south thirds of the building. I noted missing notificaton devices and two strobes overspaced.
Phone #: ###-####
|
FIR16-00821
| INSP-Sprinkler Rough-in | 8/16/2017 | 8/16/2017 | 8/16/2017 3:12:12 PM | P | PASS |
|
|
Sheet rock in Building 100 (center building) is ok to cover piping. Columns and double walls have been filled with insulation. Will need another cover inspection when the grid ceiling goes in.
Michael Phone #: ###-####
|
BLD17-00577
| FIRE-Final Inspection | 8/16/2017 | 8/16/2017 | 8/16/2017 2:02:37 PM | P | CANC |
|
|
No inspection performed. I need the project related fire alarm permit inspected/finaled prior to a life safety inspection.
Sharm Phone #: ###-####
|
FIR17-00114
| INSP-Final Inspection | 8/15/2017 | 8/16/2017 | 8/16/2017 1:56:45 PM | P | FAIL |
|
|
No city approved plans on site. No inspection performed. As previously stated plans need to be re-submitted and smoke evac zones need tested.
|
BLD17-02182
| FIRE-Final Inspection | 8/15/2017 | 8/16/2017 | 8/16/2017 11:51:56 AM | A | FAIL |
|
|
The correct suite number needs to be provided (150) or addressing needs to approve the 125
|
FIR14-00205
| INSP-Sprinkler Rough-in/Hydro | 8/15/2017 | 8/16/2017 | 8/16/2017 11:43:07 AM | A | PASS |
|
|
Overhead hydro test passed
|
NAF16-00065
| INSP-Final | 8/15/2017 | 8/16/2017 | 8/16/2017 12:00:00 AM | A | PASS |
|
|
Call prior to going Phone #: 2064786956 >> Inspection requested via mobile web by TJ
|
FIR17-00277
| INSP-Final Inspection | 8/15/2017 | 8/16/2017 | 8/15/2017 1:58:35 PM | P | CANC |
|
|
Contact is Morgan Phone #: ###-#### >> Inspection requested via web by Morgan Ahten Inspection cancelled from web by: Morgan Ahten
|