Inspections for the day of: Wednesday, August 16, 2017.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Page
TitleFIRE INSPECTOR
Phone #208-914-5431
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD17-00665 FIRE-Conference8/16/20178/16/20178/16/2017 11:15:22 AMPCANC
Fire conference rescheduled for 17AUG2017, this request is cancelled.
BLD17-00303 FIRE-Final Inspection8/15/20178/16/20178/16/2017 10:46:24 AMAPART
Contacted fire sprinkler contractor in regards to adequate fire sprinkler protection for commodities being stored in the storage racks. Fire sprinkler protection has to be increased for proper coverage of stored commodities Fire sprinkler permit for demo work is complete, no fire alarm modifications, fire extinguishers are in place with current inspection tags. Partial final inspection complete for life fire safety, fire sprinkler work for racks will need to completed at a later date, after fire sprinkler work is completed life fire safety for BLD permit can be finaled.
FIR17-00316 INSP-Final Inspection8/16/20178/16/20178/16/2017 10:37:48 AMAPASS
Final fire sprinkler inspection for this area of work passed/complete
FIR16-00222 INSP-Final Inspection8/16/20178/16/20178/16/2017 10:34:29 AMPCANC
Rescheduled for 17AUG2017, this request is cancelled.
FIR16-00586 INSP-Sprinkler Rough-in8/16/20178/16/20178/16/2017 10:31:21 AMPCANC
Inspection request rescheduled for 17AUG2017, this request is cancelled
FIR17-00282 INSP-Final Inspection8/14/20178/16/20178/16/2017 9:57:47 AMAFAIL
Fire sprinkler head in northwest corridor next to handwash sink, electrical closets is overspaced. Sprinkler head above handwash sink needs to be changed to a quick response head. Fire sprinkler heads located in level 4 elevator lobby need to be changed to quick response heads.
FIR17-00217 INSP-Sprinkler Rough-in8/16/20178/16/20178/16/2017 9:29:46 AMAPASS
Tenting inspection complete, approved for cover.