BLD17-00665
| FIRE-Conference | 8/16/2017 | 8/16/2017 | 8/16/2017 11:15:22 AM | P | CANC |
|
|
Fire conference rescheduled for 17AUG2017, this request is cancelled.
|
BLD17-00303
| FIRE-Final Inspection | 8/15/2017 | 8/16/2017 | 8/16/2017 10:46:24 AM | A | PART |
|
|
Contacted fire sprinkler contractor in regards to adequate fire sprinkler protection for commodities being stored in the storage racks. Fire sprinkler protection has to be increased for proper coverage of stored commodities Fire sprinkler permit for demo work is complete, no fire alarm modifications, fire extinguishers are in place with current inspection tags. Partial final inspection complete for life fire safety, fire sprinkler work for racks will need to completed at a later date, after fire sprinkler work is completed life fire safety for BLD permit can be finaled.
|
FIR17-00316
| INSP-Final Inspection | 8/16/2017 | 8/16/2017 | 8/16/2017 10:37:48 AM | A | PASS |
|
|
Final fire sprinkler inspection for this area of work passed/complete
|
FIR16-00222
| INSP-Final Inspection | 8/16/2017 | 8/16/2017 | 8/16/2017 10:34:29 AM | P | CANC |
|
|
Rescheduled for 17AUG2017, this request is cancelled.
|
FIR16-00586
| INSP-Sprinkler Rough-in | 8/16/2017 | 8/16/2017 | 8/16/2017 10:31:21 AM | P | CANC |
|
|
Inspection request rescheduled for 17AUG2017, this request is cancelled
|
FIR17-00282
| INSP-Final Inspection | 8/14/2017 | 8/16/2017 | 8/16/2017 9:57:47 AM | A | FAIL |
|
|
Fire sprinkler head in northwest corridor next to handwash sink, electrical closets is overspaced. Sprinkler head above handwash sink needs to be changed to a quick response head. Fire sprinkler heads located in level 4 elevator lobby need to be changed to quick response heads.
|
FIR17-00217
| INSP-Sprinkler Rough-in | 8/16/2017 | 8/16/2017 | 8/16/2017 9:29:46 AM | A | PASS |
|
|
Tenting inspection complete, approved for cover.
|