ELE18-03097
| Final | 8/15/2018 | 8/16/2018 | 8/16/2018 2:49:24 PM | A | PASS |
|
|
Robert ###-#### Ok final.
|
ELE18-02208
| Final | 8/16/2018 | 8/16/2018 | 8/16/2018 2:49:02 PM | P | CANC |
|
|
Contact on the job is Bill Stokes. Phone #: ###-#### Inspection requested via web by Richard Montgomery Talked to Bill. Re-scheduled for tomorrow morning the 17th.
|
ELE18-02640
| Electrical Rough-In | 8/16/2018 | 8/16/2018 | 8/16/2018 2:41:24 PM | P | PASS |
|
|
Wall cover/ ufer Phone #: ###-#### Inspection requested via web by cris flores Ok cover living, and re-modeled sunroom on front of house. 3 cans exterior will need fire hats upon building inspection.
|
ELE18-03100
| Electrical Rough-In | 8/16/2018 | 8/16/2018 | 8/16/2018 2:39:58 PM | P | PASS |
|
|
Need inspection of underground conduits and ground wire in ditch from equipment to the pool. Thank you. Phone #: ###-#### Inspection requested via web by Jonathan Poot Underground ok cover.
|
ELE18-01558
| Permanent Service | 8/16/2018 | 8/16/2018 | 8/16/2018 2:39:16 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by steve cooper p/s u/g n ok
|
ELE18-02122
| Permanent Service | 8/15/2018 | 8/16/2018 | 8/16/2018 2:38:57 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Jerry Moore 2 services located side by side. Service needing power is on the right side of the pedistal built. It is for the house power. p/s u/g n ok
|
ELE18-03017
| Permanent Service | 8/15/2018 | 8/16/2018 | 8/16/2018 2:25:26 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Dean Gernaat p/s u/g n ok
|
ELE18-03098
| Final | 8/15/2018 | 8/16/2018 | 8/16/2018 11:04:15 AM | A | CANC |
|
|
Panel upgrade 100 to 200 amp meter main. Contact is Alex Phone #: ###-#### Inspection requested via web by Clint Tate Inspection was to be a p/s o/h. Not a final.
|
ELE18-03098
| Permanent Service | 8/16/2018 | 8/16/2018 | 8/16/2018 11:03:47 AM | A | PASS |
|
|
Changed inspection from final to p/s. p/s o/h n ok
|
ELE18-02492
| Final | 8/15/2018 | 8/16/2018 | 8/16/2018 11:02:50 AM | A | PASS |
|
|
Please call Luke to meet you ###-####. Thanks!! Phone #: ###-#### Inspection requested via web by Clayton Morgan Ok final. Had electricain change brkr to match max fuse for ac.
|
ELE18-02020
| Final | 8/15/2018 | 8/16/2018 | 8/16/2018 9:43:11 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Chris Berthelot Ok final.
|
ELE18-03051
| Rough-In Permanent Service | 8/15/2018 | 8/16/2018 | 8/16/2018 9:09:23 AM | A | CANC |
|
|
Phone #: ###-#### Inspection requested via web by Same Electric Needed p/s at the time. Next inspection will be a final. Nothing to look at. Everything will be fished in.
|
ELE18-03051
| Permanent Service | 8/16/2018 | 8/16/2018 | 8/16/2018 9:08:33 AM | P | PASS |
|
|
Cancelled rough in. Just permanent service. p/s o/h rec ok
|
ELE18-02514
| Final | 8/15/2018 | 8/16/2018 | 8/16/2018 9:07:16 AM | A | PASS |
|
|
This House Is Open And Ready Call With Any Questions Or Concerns Thanks Dave Phone #: ###-#### Inspection requested via web by jason shifflett Ok final.
|