Inspections for the day of: Thursday, August 16, 2018.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorEric Story
TitleELE-INSPECTOR
Phone #985-3493
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE18-02953 Electrical Rough-In8/16/20188/16/20188/16/2018 2:50:56 PMPPASS
Open trench inspection Phone #: ###-#### Inspection requested via web by cris flores
U/G for parking lot lights ok to cover
ELE18-03080 Final8/16/20188/16/20188/16/2018 2:21:55 PMPPASS
Home owner should be there until 4 pm Phone #: ###-#### Inspection requested via web by Jose Guerrero
Service final ok
ELE17-03442 Final8/16/20188/16/20188/16/2018 2:21:55 PMPPASS
Phone #: ###-#### Inspection requested via web by Jeremy Cloud
Card signed..... Final ok
ELE18-02751 Final8/15/20188/16/20188/16/2018 10:42:38 AMAPASS
Final
Entrance should be thru space door 230. Phone #: ###-#### Inspection requested via web by David Feller
Card signed, final ok
ELE18-03109 Conference8/15/20188/16/20188/16/2018 10:36:18 AMAPASS
I will call and ask what time works best for you. Phone #: ###-#### Inspection requested via web by David Kubik
Home ispector stated overhead service mast was to low and not safe, service mast is perfectly fine even though NEC states 8' is the height required in witch was not adopted and ruled out due to Idaho Power will not hook up to anything over 6'. If a bucket truck can be used higher riser are accepted but once the truck cannot get into position it is ruled out. Riser is safe and restraping is the only thing required.
ELE13-01035 ELE-Aging Inspection8/16/20188/16/20188/16/2018 9:11:36 AM DONE
Contractor said fe will look into to this permit to see if another took over job
ELE13-03451 ELE-Aging Inspection8/16/20188/16/20188/16/2018 9:08:06 AM FAIL
Called and left a message
ELE18-02846 Electrical Rough-In8/15/20188/16/20188/16/2018 9:04:03 AMAPASS
Brian Prussia, tech: ###-####



Phone #: ###-#### Inspection requested via web by BRS Permitting
All Solar array materials are listed and verified scope of work
ELE18-02846 Final8/16/20188/16/20188/16/2018 9:03:56 AMPPASS
Brian Prussia, tech: ###-####



Phone #: ###-#### Inspection requested via web by BRS Permitting
Solar array final ok
ELE18-02065 Final8/15/20188/16/20188/16/2018 9:03:02 AMAPASS
Phone #: ###-#### Inspection requested via web by Darryn Coburn
Correction fixed final ok