PLM4047078
| INSP - Final | 8/16/1995 | 8/17/1995 | 8/18/1995 12:00:00 AM | A | PASS |
|
|
08/17/95 337 - FIXTURE COUNT W/C 4 BASIN 5 TUB 3 SHR 2 SINK 1 WASHER 1 W REPAIR MINOR LEAK IN WATER LINE ABOVE EJECTOR PUMP
|
PLM4047235
| INSP - Sprinkler & Backflow | 8/16/1995 | 8/17/1995 | 8/18/1995 12:00:00 AM | A | PASS |
|
|
08/17/95 337 -
|
PLM95-00217
| INSP - Final | 8/16/1995 | 8/17/1995 | 8/18/1995 12:00:00 AM | A | PASS |
|
|
08/17/95 337 - FIXTURE COUNT W/C 2 BASIN 2 TUB 1 SHR 1 SINK 1 WASHER W/H
|
PLM95-00249
| INSP - Final | 8/16/1995 | 8/17/1995 | 8/18/1995 12:00:00 AM | A | PASS |
|
|
08/17/95 337 - FIXTURE COUNT W/C 2 BASIN 2 TUB 1 SHR 1 SINK 1 WASHER 1 W
|
PLM95-00115
| INSP - Final | 8/17/1995 | 8/17/1995 | 8/18/1995 12:00:00 AM | P | PASS |
|
|
08/17/95 337 - KEY ABOVE DOOR FIXTURE COUNT W/C 2 BASIN 2 TUB 2 SINK 1 WASHER 1 W/H 1
|
MEC95-00378
| INSP - Final | 8/17/1995 | 8/17/1995 | 8/18/1995 12:00:00 AM | P | PASS |
|
|
08/17/95 337 - FNL -OK FINAL
|
PLM95-00648
| INSP - Sewer line | 8/17/1995 | 8/17/1995 | 8/18/1995 12:00:00 AM | P | PASS |
|
|
08/17/95 337 -
|
PLM95-00648
| INSP - Water lines | 8/17/1995 | 8/17/1995 | 8/18/1995 12:00:00 AM | P | PASS |
|
|
08/17/95 337 -
|
MEC95-00564
| INSP - Framing/ Rough-in | 8/17/1995 | 8/17/1995 | 8/18/1995 12:00:00 AM | P | PASS |
|
|
08/17/95 337 - READY ANYTIME RGHN-OK ROUGH IN ì
|
MEC95-00579
| INSP - Gas pressure test | 8/17/1995 | 8/17/1995 | 8/17/1995 12:00:00 AM | | FAIL |
|
|
NEEDS TO SIZE GAS TO PLAN AND RETEST 15 MIN
|
MEC95-00471
| INSP - Framing/ Rough-in | 8/17/1995 | 8/17/1995 | 8/17/1995 12:00:00 AM | | FAIL |
|
|
STILL NEED 1" VENT CLEARANCE IN UPSTAIRS WALL 20 MIN
|
PLM95-00652
| INSP - Water lines | 8/17/1995 | 8/17/1995 | 8/17/1995 12:00:00 AM | | PASS |
|
|
/ / 337 -
|
PLM95-00652
| INSP - Sewer line | 8/17/1995 | 8/17/1995 | 8/17/1995 12:00:00 AM | | PASS |
|
|
/ / 337 -
|
PLM95-00653
| INSP - Sewer line | 8/17/1995 | 8/17/1995 | 8/17/1995 12:00:00 AM | | PASS |
|
|
/ / 337 -
|
PLM95-00653
| INSP - Water lines | 8/17/1995 | 8/17/1995 | 8/17/1995 12:00:00 AM | | PASS |
|
|
/ / 337 -
|
MEC95-00031
| INSP - Final | 8/17/1995 | 8/17/1995 | 8/17/1995 12:00:00 AM | A | PASS |
|
|
FINAL/20 MIN
|
PLM4047477
| INSP - Framing/ Rough-in | 8/16/1995 | 8/17/1995 | 8/17/1995 12:00:00 AM | A | PASS |
|
|
08/17/95 337 - FIXTURE COUNT W/C 4 BASIN 5 TUB 3 SHR 2 SINK 1 LAUNDRY SI W/H 1
|
PLM95-00299
| INSP - Final | 8/17/1995 | 8/17/1995 | 8/17/1995 12:00:00 AM | P | PASS |
|
|
08/17/95 337 - FIXTURE COUNT W/C 2 BASIN 3 TUB 2 SINK 1 WASHER 1
|
MEC95-00457
| INSP - Framing/ Rough-in | 8/17/1995 | 8/17/1995 | 8/17/1995 12:00:00 AM | P | FAIL |
|
|
NO ACCESS/15 MIN
|
MEC3047601
| INSP - Final | 8/17/1995 | 8/17/1995 | 8/17/1995 12:00:00 AM | P | PASS |
|
|
FINAL/20 MIN
|
MEC3047848
| INSP - Gas pressure test | 8/17/1995 | 8/17/1995 | 8/17/1995 12:00:00 AM | P | PASS |
|
|
08/17/95 337 - GP -OK GAS PIPING
|