BLD98-00758
| INSP - Framing/Rough-in | 8/13/1998 | 8/17/1998 | 8/17/1998 12:00:00 AM | A | PART |
|
|
JOE ###-#### FRAM AND WALLCOVER...int partitions ok...need bracing per plan at grid.
|
BLD98-01267
| INSP - Energy code compliance | 8/17/1998 | 8/17/1998 | 8/17/1998 12:00:00 AM | P | PASS |
|
|
patty ###-####
|
BLD98-01267
| INSP - Framing/Rough-in | 8/17/1998 | 8/17/1998 | 8/17/1998 12:00:00 AM | P | PASS |
|
|
reinsp...c/n ok, still need permanant columns, chk at final.
|
MEC97-01874
| INSP - Final | 8/14/1998 | 8/17/1998 | 8/17/1998 12:00:00 AM | P | FAIL |
|
|
Scheduled by Hello!. Contact phone is [3426863]. need doors at fp...separate permit?
|
MEC97-01874
| INSP - Final | 8/14/1998 | 8/17/1998 | 8/17/1998 12:00:00 AM | P | FAIL |
|
|
Scheduled by Hello!. Contact phone is [3426863]. need doors at fp...separate permit?
|
BLD96-00907
| INSP - Framing/Rough-in | 8/17/1998 | 8/17/1998 | 8/17/1998 12:00:00 AM | P | NR |
|
|
conf only...w/ eng'r for "remodel"; swo issued as new permit req'd. plan check req'd eng'g prior to new permit. consulted w/ eng'r...need plans stamped and letter describing analysis.
|
BLD97-02259
| INSP - Framing/Rough-in | 8/17/1998 | 8/17/1998 | 8/17/1998 12:00:00 AM | P | PART |
|
|
no phone #...employee patio area, drywall ok for 2hr wall/ 1hr lid; need clarification for protection of roof framing at opposite side (cafeteria). need to complete firestopping before cover at lid.
|