ELE00-03172
| Electrical Rough-In | 8/16/2000 | 8/17/2000 | 8/17/2000 12:00:00 AM | A | PASS |
|
|
allen-- ###-#### r/i . garage ele r/i; perm/svc 8/17/2000 6:37:48 PM
|
ELE00-03173
| Electrical Rough-In | 8/16/2000 | 8/17/2000 | 8/17/2000 12:00:00 AM | A | PASS |
|
|
FOR NEW WALLS ONLY -BRENDA-- ###-####--R/I. print-shop (basement) two walls ele r/i. 8/17/2000 6:36:40 PM
|
ELE00-02762
| Electrical Rough-In | 8/16/2000 | 8/17/2000 | 8/17/2000 12:00:00 AM | A | PASS |
|
|
this is the one you went out on and turned it down because it had no bld permit, now there is a permit,\\###-####. walls &ceiling ele ri 8/17/2000 6:35:15 PM
|
ELE00-03177
| Final | 8/16/2000 | 8/17/2000 | 8/17/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 08/16/2000 at 16:13:18. Contact: ###-####. no access; left card, called contractor; will reschedule. 8/17/2000 6:41:30 PM
|
ELE00-03180
| Rough-In Permanent Service | 8/17/2000 | 8/17/2000 | 8/17/2000 12:00:00 AM | P | PART |
|
|
chad ###-####-Conference also. conference only. sub-panel location. 8/17/2000 6:46:12 PM
|
ELE00-02772
| Final | 8/17/2000 | 8/17/2000 | 8/17/2000 12:00:00 AM | P | PASS |
|
|
###-####. corrections completed. 8/17/2000 6:45:00 PM
|
ELE00-03186
| Electrical Rough-In | 8/17/2000 | 8/17/2000 | 8/17/2000 12:00:00 AM | P | CANC |
|
|
Lenny ###-####\\canc by lenny
|