FIR00-00473
| INSP-Supply line flush | 8/16/2000 | 8/17/2000 | 8/17/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 08/16/2000 at 12:47:00. Contact: ###-####. okay to cover partially until drainage of FDC's are corrected 8/17/2000 12:52:32 PM
|
FIR00-00473
| INSP-Supply line flush | 8/16/2000 | 8/17/2000 | 8/17/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 08/16/2000 at 12:47:00. Contact: ###-####. okay to cover partially until drainage of FDC's are corrected 8/17/2000 12:52:32 PM
|
BLD00-02005
| FIRE-Conference | 8/17/2000 | 8/17/2000 | 8/17/2000 12:00:00 AM | A | PART |
|
|
Added by Inspector: 409 On 8/17/2000 discussed the need to submit fire alarm plans and checked sprinkler heads - okay
|
BLD00-02005
| FIRE-Conference | 8/17/2000 | 8/17/2000 | 8/17/2000 12:00:00 AM | A | PART |
|
|
Added by Inspector: 409 On 8/17/2000 discussed the need to submit fire alarm plans and checked sprinkler heads - okay
|
BLD00-00254
| FIRE-Alarm Testing | 8/17/2000 | 8/17/2000 | 8/17/2000 12:00:00 AM | A | FAIL |
|
|
Added by Inspector: 409 On 8/17/2000 strobes not synchronized in FM areas; batteries not installed; dialer not ready; smoke detectors at supply air diffusers
|
FIR99-00604
| INSP-Final Inspection | 8/17/2000 | 8/17/2000 | 8/17/2000 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 409 On 8/17/2000
|
BLD99-01720
| FIRE-Final Inspection | 8/17/2000 | 8/17/2000 | 8/17/2000 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 409 On 8/17/2000
|