Inspections for the day of: Friday, August 17, 2001.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-00106 BLD-Conference8/16/20018/17/20018/17/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 08/16/2001 at 14:36:28. Contact: ###-####...pre-con & walk-thru. 1hr add'n
8/17/2001 12:11:35 PM
BLD99-01122 BLD-Final8/16/20018/17/20018/17/2001 12:00:00 AMANR
doc-- ###-#### fn--call 1st before insp; need verify all other insps prior to final 8/17/2001 10:27:47 AM
BLD97-03575 BLD-Final8/16/20018/17/20018/17/2001 12:00:00 AMANR
fn insp doc -###-####--call 1st before insp; appears to be finalled, called Doc...will consult. Chk w/ Cathy if card in office or ? 8/17/2001 10:35:54 AM
BLD99-01404 BLD-Final8/16/20018/17/20018/17/2001 12:00:00 AMANR
doc ###-#### fn ; need verify other ok's/insps;called Doc, will consult RickJ. & Perry. 8/17/2001 10:43:52 AM
BLD01-00594 BLD-Conference8/17/20018/17/20018/17/2001 12:00:00 AMAPASS
Added by Inspector: 340 On 8/17/2001 8:03:26 AM w/ Otis Lemon re energy code & shear walls for project....consult w/ 325?
BLD00-02175 BLD-Conference8/17/20018/17/20018/17/2001 12:00:00 AMAPASS
Added by Inspector: 340 On 8/17/2001 10:31:33 AM w/Christina re exit door, keep c/n.
BLD01-01014 BLD-Conference8/17/20018/17/20018/17/2001 12:00:00 AMPPASS
Added by Inspector: 340 On 8/17/2001 5:26:06 PM w/ Tony & contractor re finals
BLD00-03185 BLD-Conference8/17/20018/17/20018/17/2001 12:00:00 AMPFAIL
Added by Inspector: 340 On 8/17/2001 5:30:58 PM final walk-thru w/ Tony & Petra...c/n issued re exits, fire & other insps not complete, storage below stairs, etc. Partial insp only (to identify life-safety issues.) Phase 1 of project.
BLD01-02115 BLD-Energy code compliance8/16/20018/17/20018/17/2001 12:00:00 AMPPASS
###-#### florence; ok per 415 8/17/2001 5:31:18 PM