FIR03-00737
| FIR-Aging Inspection | 8/17/2004 | 8/17/2004 | 8/17/2004 12:00:00 AM | | NR |
|
|
Per the secretary at AIC's office they haven't started the install yet because the building is not built yet. 8/17/2004 4:00:00 PM
|
BLD04-01082
| FIRE-Final Inspection | 8/16/2004 | 8/17/2004 | 8/17/2004 12:00:00 AM | A | FAIL |
|
|
Zone 4 of the mall fire alarm zone that controls the smoke evacuation is inoperative. No inspection performed. 8/17/2004 4:03:31 PM
|
FIR03-00453
| INSP-Final Inspection | 8/16/2004 | 8/17/2004 | 8/17/2004 12:00:00 AM | A | PART |
|
|
All of the notification devices in the central area (retirement) were tested. Spot smoke detectors in the central (retirement) area were tested. Second floor west central corridor smokes are mislabeled as first floor. 8/17/2004 4:01:41 PM
|
FIR04-00364
| INSP-Final Inspection | 8/16/2004 | 8/17/2004 | 8/17/2004 12:00:00 AM | P | FAIL |
|
|
Provide Knox key box. Provide duct smoke detector on HVAC unit #2 for the office area. Sync strobes in the multipurpose room. Test second smoke detector on zone #5 HVAC unit. Verify battery calculations on the facp and nac panels. Verify wiring integrity between nacs and facp. Verify dedicated circuits. Verify that alarm only output is permissable with plan reviewer. 8/17/2004 4:08:20 PM
|