Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorPat Lass
TitleELE-INSPECTOR
Phone #794-9478
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE06-01601 ELE-Aging Inspection8/17/20068/17/20068/18/2006 4:15:20 PM NR
will be ready for final next week
ELE06-01800 ELE-Aging Inspection8/17/20068/17/20068/18/2006 3:43:30 PM NR
suc
ELE06-01318 Final8/17/20068/17/20068/18/2006 8:50:19 AMANR
###-#### - steve
had conf told them that they would have to have the outlets installed above the counter.
ELE06-01842 Final8/17/20068/17/20068/17/2006 4:27:13 PMPPASS
pat; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
ELE06-02818 Rough-In Permanent Service8/17/20068/17/20068/17/2006 3:43:12 PMPPART
lisa ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
R/I Ok
gec is not witrhout splice from panel to panel
ELE06-02951 Permanent Service8/17/20068/17/20068/17/2006 2:40:39 PMPPASS
Dave; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
P/S O/H R Ok
ELE06-03037 Permanent Service8/16/20068/17/20068/17/2006 1:48:05 PMPPART
My cell number is ###-#### if you have any questions. Thank you. Randy; Phone #: ###-#### Internet Inspection Request from: Randy Fletcher
This is ok until new roof is installed then it will be raised up through the new roof
ELE06-03060 Permanent Service8/16/20068/17/20068/17/2006 1:07:39 PMANR
PLEASE INSPECT THE NEW METER BASE THAT WAS INSTALLED TO REPAIR THE ONE THAT WAS TORN OFF THE HOUSE. THANK YOU.; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH
drive ground rods and isolate neutral load side of main.
ELE06-03028 Temporary Service8/17/20068/17/20068/17/2006 12:50:02 PMPPASS
shane ###-####
T/SO/H Ok
ELE06-03048 Rough-In Permanent Service8/16/20068/17/20068/17/2006 11:47:33 AMAPART
Phone #: ###-#### Internet Inspection Request from: DJ Carman
R/I Ok
No electrode for service
ELE06-03055 Final8/16/20068/17/20068/17/2006 10:03:27 AMAPASS
Please call ahead so we can meet you at the site. This is a temporary connection.; Phone #: ###-#### Internet Inspection Request from: Steve Syltie
ELE06-03054 Final8/16/20068/17/20068/17/2006 9:44:30 AMAFAIL
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
only 1 service permited to a building.
I called the contractor and was told that he will locate the feeder to the garage and remove it and provide minimum requirements for power to garage portion
ELE05-03703 Electrical Rough-In8/16/20068/17/20068/17/2006 8:55:36 AMAPART
Scheduled by a contractor via Hello! on 8/16/2006 at 12:40:52 PM. Contact: ###-####.
3rd floor ceiling ANOP
ELE06-02410 Electrical Rough-In8/16/20068/17/20068/17/2006 8:32:13 AMAPASS
larry Note: 8:30 inspection; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
ELE06-03042 Rough-In Permanent Service8/16/20068/17/20068/17/2006 8:28:28 AMACANC
keith; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
canceled by contractor
ELE06-03056 Final8/16/20068/17/20068/17/2006 12:00:00 AMPCANC
cance as per jean- duplicate permit rod; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley