Inspections for the day of: Friday, August 17, 2007.
Number of inspections: 25
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD07-01441 FIRE-Final Inspection8/17/20078/17/20078/17/2007 5:27:57 PMPDEFR
To be rescheduled pending HVAC issues.
BLD07-01067 FIRE-Final Inspection8/17/20078/17/20078/17/2007 5:26:55 PMPFAIL
RTU 1 exceeds 2000 cfm per plans, need to install duct smoke detection as required per mechanical code and fire code review notes.
FIR07-00233 INSP-Sprinkler Rough-in8/16/20078/17/20078/17/2007 4:20:49 PMAPART
DSW head installation at the second floor unit balconies appears acceptable, need approved plans on site for verification at next scheduled inspection.
BLD07-00623 FIRE-Alarm Testing8/15/20078/17/20078/17/2007 3:58:22 PMAFAIL
Intended for life safety final which is not ready at this time, the project related fire alarm permit has been completed and finaled.
BLD07-01426 FIRE-Final Inspection8/16/20078/17/20078/17/2007 3:53:30 PMPPASS
Fire life safety is acceptable, contractor to install PFE as discussed prior to structural final.
FIR07-00667 INSP-Sprinkler Rough-in/Hydro8/17/20078/17/20078/17/2007 3:38:31 PMPDEFR
Rescheduled per conversation with contractor.
FIR07-00603 INSP-Final Inspection8/16/20078/17/20078/17/2007 3:37:38 PMAFAIL
Need to fire stop locations where the new main and hose valve piping pass through the riser room walls to maintain the 1hr. rating, missing hangers at one piece of new 4" main, the flow switch has been left mechanicaly disabled and needs to be put back into service immediately-notified contractor this is to be done ASAP.



FIR07-00587 INSP-Final Inspection8/17/20078/17/20078/17/2007 2:13:23 PMPDEFR
Scheduled by a contractor via Hello! on 8/17/2007 at 9:37:00 AM. Contact: ###-#### Overbooked, no time available to complete this inspection today, to be rescheduled as discussed with contractor.
FIR07-00643 INSP-Final Inspection8/16/20078/17/20078/17/2007 2:07:35 PMPPART
Necessary corrections have been made, OH install is approved for cover at the drop ceilings, final pending ceiling tile and escutcheons.
FIR07-00520 INSP-Final Inspection8/17/20078/17/20078/17/2007 2:04:59 PMAPASS
Fire sprinkler permit finaled.
BLD07-00349 FIRE-Final Inspection8/16/20078/17/20078/17/2007 2:03:35 PMAPART
Inspection site visit intended for a conference regarding knox box locations and fire sprinkler permit rough-in inspection for sprinklers at the first two roof dormers due to access issues.
FIR07-00143 FIR-Aging Inspection8/17/20078/17/20078/17/2007 1:59:38 PM DEFR
Work in progress.
FIR07-00141 INSP-Sprinkler Rough-in8/16/20078/17/20078/17/2007 1:58:58 PMANR
Pending light fixture obstruction issues.
FIR07-00142 INSP-Sprinkler Rough-in8/16/20078/17/20078/17/2007 1:58:06 PMANR
Pending light fixture obstruction issues.
FIR07-00145 INSP-Sprinkler Rough-in8/16/20078/17/20078/17/2007 1:57:14 PMANR
Pending light fixture obstruction issues.
FIR07-00149 INSP-Sprinkler Rough-in8/16/20078/17/20078/17/2007 1:56:26 PMANR
Pending light fixture obstruction issues.
FIR07-00150 INSP-Sprinkler Rough-in8/16/20078/17/20078/17/2007 1:55:38 PMANR
Pending light fixture obstruction issues.
FIR07-00035 INSP-Sprinkler Rough-in8/16/20078/17/20078/17/2007 1:54:46 PMANR
Pending light fixture obstruction issues.
FIR06-00504 INSP-Sprinkler Rough-in8/16/20078/17/20078/17/2007 1:53:50 PMAPART
1st floor dry system at the NE covered parking area is approved for cover, noted installer to maintain spacing per design not to exceed 120ft sq.
FIR07-00031 INSP-Sprinkler Rough-in8/16/20078/17/20078/17/2007 1:50:34 PMANR
Pending light fixture obstruction issues.
FIR07-00572 INSP-Final Inspection8/16/20078/17/20078/17/2007 12:09:46 PMAPASS
Fire sprinkler work passed final inspection, permit finaled.
FIR07-00593 INSP-Sprinkler Rough-in/Hydro8/16/20078/17/20078/17/2007 12:08:43 PMAPART
Corrections have been completed, tenting is acceptable, OH fire sprinklers are okay for cover.
FIR07-00624 INSP-Final Inspection8/16/20078/17/20078/17/2007 12:04:59 PMAPART
Final pending installation of ceiling tile and escutcheons at all areas.
FIR07-00624 INSP-Sprinkler Rough-in8/16/20078/17/20078/17/2007 12:03:19 PMAPART
Verified required corrections have been made, overhead installation is approved for cover at the drop ceilings.
FIR07-00572 INSP-Final Inspection8/16/20078/17/20078/16/2007 2:24:21 PMACANC
Please call 1/2 hour prior to inspection. Charles is the contact, thank you. Phone #: ###-#### Internet Inspection Request from: Stan Beus Inspection cancelled from web by: Stan Beus