Inspections for the day of: Friday, August 17, 2007.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR07-00682 INSP-Final Inspection8/17/20078/17/20078/20/2007 4:38:26 PMPCANC
To be rescheduled
BLD07-00948 FIRE-Final Inspection8/17/20078/17/20078/17/2007 3:44:57 PMPPART
This inspection was for the electronics area only. This area is ok to occupy.
MIS07-00158 FIR-Final8/17/20078/17/20078/17/2007 3:43:27 PMPPART
A temporary occupancy was given until the fire extinguisher is tagged a sticker is put at the main exit as discussed and lever hardware is installed at the rear exit.
BLD07-00376 FIRE-Final Inspection8/17/20078/17/20078/17/2007 3:40:22 PMPFAIL
The wall layout as installed does not match the approved plans. I could not get ahold of Marlene of Jim Storey to see if it was ok to not have resubmittals.
BLD07-00377 FIRE-Final Inspection8/17/20078/17/20078/17/2007 2:48:00 PMPPASS
Life safety passed.
FIR07-00130 INSP-Sprinkler Rough-in8/16/20078/17/20078/17/2007 2:47:29 PMPPASS
The underspaced heads have been corrected as well as the hangers in the common corridors. The sprinkler piping in the corridors can be covered. The items remaining are the attic system needs to be hydro tested due to the changes and a 24 hour test also the typical final issues such as forward flush, tags, signage.....ect.
BLD07-00598 FIRE-Final Inspection8/17/20078/17/20078/17/2007 2:23:42 PMPPASS
Life safety passed
BLD07-02047 FIRE-Final Inspection8/16/20078/17/20078/17/2007 2:01:00 PMAPASS
life safety passed
BLD07-00491 FIRE-Final Inspection8/17/20078/17/20078/17/2007 1:41:30 PMPPART
A temporary occupancy was given with dave hannimans permission until the hvac unit is installed and a fire alarm permit is issued
FIR07-00459 INSP-Supply line flush8/16/20078/17/20078/17/2007 1:32:23 PMAPASS
The underground flush and hydro test passed.
FIR07-00163 INSP-Sprinkler Rough-in8/15/20078/17/20078/17/2007 1:22:01 PMAPASS
See the city approved plans for locations where the spirnkler piping is ok to cover. Ceilings will need to be added in the mechanical closets or the walls will need to extend to the deck. The upright will not suffice. A separation is needed between the sprinklered area and the non-sprinklered area
FIR05-00536 INSP-Sprinkler Rough-in/Hydro8/16/20078/17/20078/17/2007 12:24:47 PMAPASS
6th and 7th floor hydro tests passed
FIR07-00381 INSP-Final Inspection8/16/20078/17/20078/17/2007 8:49:32 AMAPASS
Permit finaled
FIR07-00545 INSP-Final Inspection8/16/20078/17/20078/17/2007 7:44:09 AMAPASS
permit finaled