PLM11-00880
| Roof Drains | 8/17/2011 | 8/17/2011 | 8/17/2011 4:50:05 PM | P | NH |
|
|
JOB CONTACT IS TERRY Phone #: ###-#### >> Inspection requested via web by ADAM WARR rescheduled...........ds
|
PLM11-01427
| Final | 8/17/2011 | 8/17/2011 | 8/17/2011 4:43:56 PM | P | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Ken Jones
|
PLM11-01637
| Plumbing Rough-in | 8/17/2011 | 8/17/2011 | 8/17/2011 4:27:22 PM | P | PASS |
|
|
mait Phone #: ###-#### >> Inspection requested via web by j mait downer jr
|
PLM11-01632
| Sprinkler (Final) | 8/17/2011 | 8/17/2011 | 8/17/2011 4:14:15 PM | P | PASS |
|
|
|
PLM11-01632
| Water and/or Sewer | 8/16/2011 | 8/17/2011 | 8/17/2011 4:13:53 PM | P | CANC |
|
|
Lot 14, Blk 4 cross street is bogus basin rd Phone #: ###-#### >> Inspection requested via web by Blake Huskey
|
PLM11-01506
| Final | 8/17/2011 | 8/17/2011 | 8/17/2011 3:52:27 PM | P | PASS |
|
|
|
GCP11-00097
| GCP-Water and/or Sewer | 8/17/2011 | 8/17/2011 | 8/17/2011 3:15:25 PM | P | PASS |
|
|
Gene @ ###-#### address is 10297 cultis bay................ds
|
GCP11-00092
| GCP-Final | 8/16/2011 | 8/17/2011 | 8/17/2011 2:53:18 PM | A | CANC |
|
|
FinalTom @ ###-####As close to 2 PM as possible
|
PLM11-00680
| Final | 8/17/2011 | 8/17/2011 | 8/17/2011 2:29:00 PM | P | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Brandon Rohricht
|
PLM11-00872
| PLM-Aging Inspection | 8/17/2011 | 8/17/2011 | 8/17/2011 1:49:11 PM | | PASS |
|
|
forgot to call in...........ds
|
GCP11-00093
| GCP-Under Floor | 8/15/2011 | 8/17/2011 | 8/17/2011 1:45:32 PM | A | PASS |
|
|
UnderfloorKinley @ ###-####Call in advance
|
GCP11-00093
| GCP- Rough-in | 8/15/2011 | 8/17/2011 | 8/17/2011 1:45:08 PM | A | PASS |
|
|
Rough-InKinley @ ###-####Call in advance
|
PLM11-00854
| Water Heater Final | 8/17/2011 | 8/17/2011 | 8/17/2011 10:24:25 AM | A | PASS |
|
|
|
PLM11-00854
| PLM-Aging Inspection | 8/17/2011 | 8/17/2011 | 8/17/2011 10:24:09 AM | | PASS |
|
|
|
PLM11-01630
| Storm Drains | 8/16/2011 | 8/17/2011 | 8/16/2011 4:39:34 PM | A | PART |
|
|
Chris Hansen Phone #: ###-#### met with contractor and discussed testing piping and intercepter...............ds
|