Inspections for the day of: Wednesday, August 17, 2011.
Number of inspections: 18
Percentage of inspections complete: 94 %
Percentage of inspections not complete: 6 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC11-00039 General Inspection8/12/20118/12/2011   
BLD11-00111 BLD-Final8/17/20118/17/20118/17/2011 5:10:08 PMPCANC
ESC11-00478 Site Preparation8/17/20118/17/20118/17/2011 3:28:57 PMPPART
Needs to post ESC permit sign.
BLD11-01622 BLD-Footing8/17/20118/17/20118/17/2011 3:28:10 PMPPART
Tim Phone #: ###-####. Footing ok, possible property ilne issue, setback can not be accurately determined. Assumed propertyline puts exterior wall inside the required 5 ft. Contractor to determine were property line is.
ESC11-00573 Site Preparation8/17/20118/17/20118/17/2011 3:13:24 PMPPASS
BLD11-01896 BLD-Footing8/17/20118/17/20118/17/2011 3:12:42 PMPPASS
mana Phone #: ###-####
ESC11-00226 Random Inspection8/17/20118/17/20118/17/2011 2:51:29 PMPPASS
BLD11-00781 BLD-Energy code compliance8/17/20118/17/20118/17/2011 2:51:18 PMPPASS
Wall insulation at the perimeter framing. Phone #: ###-#### >> Inspection requested via web by Chris Palmer
ESC10-00670 General Inspection8/17/20118/17/20118/17/2011 2:20:59 PMPPASS
BLD10-02069 BLD-Footing8/17/20118/17/20118/17/2011 2:20:47 PMPNR
Soils issues with driiled piers, wating for geo-tech and engineering response.
BLD11-01260 BLD-Framing/Rough-in8/17/20118/17/20118/17/2011 1:46:05 PMPFAIL
rustin Phone #: ###-####. Fireblocking and furouts for kneewalls and vaulted areas completed. ok to insulate. All other items not yet repaired.
ESC11-00352 Random Inspection8/17/20118/17/20118/17/2011 1:44:53 PMPPASS
BLD11-00111 BLD-Final8/16/20118/17/20118/17/2011 11:14:44 AMAPASS
Final walk with Troy Cobbley for racking. Will also need Michael Jordan to inspect after Troy to final out. Please call with any questions, thanks. Phone #: ###-#### >> Inspection requested via web by alan fontenot
BLD11-00111 DOC - Permit Finaled8/17/20118/17/20118/17/2011 11:14:36 AMPPASS
BLD11-01285 BLD-Framing/Rough-in8/16/20118/17/20118/17/2011 11:14:16 AMAFAIL
Micah Phone #: ###-####. Strap top plate at plumbing penetration @ bathroom 1st. floor, provide approved plans, provide addditional nailing at LVL in main halway supporting roof and 2nd floor waal, insufficient bearing. Ok to insulate, correction notice posted.
ESC11-00356 General Inspection8/17/20118/17/20118/17/2011 11:11:57 AMAPASS
BLD11-00740 BLD-Final8/17/20118/17/20118/17/2011 9:29:46 AMAPASS
rustin please call for access code Phone #: ###-####
BLD11-00740 DOC - Permit Finaled8/17/20118/17/20118/17/2011 9:29:34 AMPPASS
All issues were resolved. A laminate safety film was installed on window that needed to be tempered and meets ANSI Z 97.1. A letter will be scanned into permit docs from Idaho window tinting. Residential certificate of occupancy was issued.