FIR16-00107
| INSP-Sprinkler Rough-in/Hydro | 8/17/2016 | 8/17/2016 | 8/17/2016 1:56:16 PM | P | PASS |
|
|
Overhead hydro passed
|
FIR16-00500
| INSP-Final Inspection | 8/17/2016 | 8/17/2016 | 8/17/2016 10:32:03 AM | P | PASS |
|
|
Permit finaled
|
BLD16-02315
| FIRE-Final Inspection | 8/17/2016 | 8/17/2016 | 8/17/2016 10:30:57 AM | P | PASS |
|
|
life safety passed
|
BLD16-02377
| FIRE-Final Inspection | 8/17/2016 | 8/17/2016 | 8/17/2016 10:30:12 AM | P | PASS |
|
|
life safety passed
|
FIR16-00152
| INSP-Final Inspection | 8/15/2016 | 8/17/2016 | 8/17/2016 10:28:12 AM | A | FAIL |
|
|
Not ready for a final yet. Need hydro test, need siesmic bracing at the top of riser, need coverage in the combustible concealed space, need upright uncovered in the server room, possibly need additional head in the Server room
|
FIR16-00211
| INSP-Final Inspection | 8/17/2016 | 8/17/2016 | 8/17/2016 9:00:26 AM | P | PASS |
|
|
permit finaled
|
FIR16-00211
| INSP-Sprinkler Rough-in/Hydro | 8/17/2016 | 8/17/2016 | 8/17/2016 9:00:03 AM | P | CANC |
|
|
Wrong inspection type scheduled
|
FIR16-00211
| INSP-Sprinkler Rough-in/Hydro | 8/16/2016 | 8/17/2016 | 8/17/2016 8:59:17 AM | P | CANC |
|
|
Wrong inspection type scheduled
|
FIR16-00045
| INSP-Final Inspection | 8/16/2016 | 8/17/2016 | 8/17/2016 8:50:26 AM | P | PASS |
|
|
Permit finaled
|
FIR16-00045
| INSP-Final Inspection | 8/16/2016 | 8/17/2016 | 8/17/2016 8:49:48 AM | A | PASS |
|
|
Permit finaled.
|