NAF16-00007
| INSP-Sprinkler Rough-in | 8/16/2016 | 8/17/2016 | 8/17/2016 2:39:54 PM | P | DONE |
|
|
Rough-in 1st & 2nd floor completed satisfactory. Two missing hangars fixed on the spot. **Sidewalls and riser not installed, these areas must remain uncovered for inspection.**
|