Inspections for the day of: Thursday, August 17, 2017.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Storey
TitleBLD-COM/RES INSPECTOR
Phone #794-9490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD15-04178 BLD-Aging Inspection8/17/20178/17/20178/17/2017 4:55:57 PM PASS
BLD15-04457 BLD-Aging Inspection8/17/20178/17/20178/17/2017 4:55:07 PM PASS
10/2/17 exp ncfi
MIS17-00125 MIS-Aging Inspection8/17/20178/17/20178/17/2017 4:53:27 PM PASS
MIS17-00125 DOC - Permit Finaled8/17/20178/17/20178/17/2017 4:53:14 PMPPASS
MIS17-00131 MIS-Aging Inspection8/17/20178/17/20178/17/2017 4:52:18 PM DONE
MIS17-00131 DOC - Permit Finaled8/17/20178/17/20178/17/2017 4:52:02 PMPPASS
MIS17-00039 MIS-Aging Inspection8/17/20178/17/20178/17/2017 4:45:55 PM FAIL
c/n no permits isued/ no ele
BLD17-02361 BLD-Wall Bracing8/17/20178/17/20178/17/2017 4:42:30 PMPDEFR
Jay Phone #: ###-#### out of time
BLD16-04117 BLD-Framing/Rough-in8/16/20178/17/20178/17/2017 4:40:29 PMAPASS
Please call Gary @ ###-#### 30 min prior to arrival. Thanks Phone #: ###-#### Inspection requested via web by Gary Beck

[External] ORCHARD PLACE DEQ ENTRY
GB
Gary Beck
Reply all|
Today, 3:31 PM
Jim Storey; +1 more
CAUTION: This email originated from an external entity. Do not click links, or open attachments, unless you recognize the sender and know the content is safe.

RE:
ORCHARD PLACE DEQ ENTRY
1410 N. HILTON STREET
BLD 16-04117

ATTENTION Boise City Building Inspector Jim Storey


Jim,

As per our conversation earlier today and NFPA code below, we have elected to blow the attic with non combustible insulation. Per our conversation we will provide a bag blow count. As discussed we will call for a soffit inspection after type x drywall is installed per approved plans.

Thanks for your help.

Gary
Beck Construction, Inc.

NFPA 13 code sections:



8.15.7 * Exterior
Projections.

8.15.7.1

Unless the requirements of 8.15.7.2, 8.15.7.3,
or 8.15.7.4 are
met, sprinklers shall be installed under exterior projections exceeding 4 ft (1.2 m) in width.

8.15.7.2 *

Sprinklers shall be permitted to be omitted where the exterior projections are constructed with materials that are noncombustible,
limited-combustible, or fire retardant–treated wood as defined in NFPA 703.

8.15.7.3

Sprinklers shall be permitted to be omitted from below the exterior projections of combustible construction,
provided the exposed finish material on the exterior projections are noncombustible, limited-combustible, or fire retardant–treated wood as defined in NFPA 703,
and the exterior projections contain only sprinklered concealed spaces or any of the following unsprinklered combustible concealed spaces:

(1)
Combustible concealed spaces filled entirely with noncombustible insulation

(2)
Light or ordinary hazard occupancies where noncombustible or limited-combustible ceilings are directly attached to the
bottom of solid wood joists so as to create enclosed joist spaces 160 ft3 (4.5 m3)
or less in volume, including space below insulation that is laid directly on top or within the ceiling joists in an otherwise sprinklered attic [see 11.2.3.1.4(4)(d)]

(3)
Concealed spaces over isolated small exterior projections not exceeding 55 ft2 (5.1 m2)
in area

8.15.7.4

Sprinklers shall be permitted to be omitted from exterior exit corridors when the exterior walls of the corridor are
at least 50 percent open and when the corridor is entirely of noncombustible construction.

8.15.7.5 *

Sprinklers shall be installed under exterior projections greater than 2 ft (0.6 m) wide over areas where combustibles
are stored.

BLD16-03440 BLD-Conference8/17/20178/17/20178/17/2017 4:37:31 PMPDONE
Meet to walk Stage C competition, East side Chem rooms. Erik Holinka''s phone number above. Phone #: ###-#### walk thru to verify microns protocall for chem rooms
BLD17-02863 BLD-Footing8/17/20178/17/20178/17/2017 4:30:52 PMPPASS
Rob Phone #: ###-#### mono placement ok
BLD17-01070 BLD-Energy code compliance8/16/20178/17/20178/17/2017 3:55:28 PMAPASS
BLD17-01943 BLD-Foundation8/16/20178/17/20178/17/2017 11:23:03 AMAFAIL
Jim Phone #: ###-#### need engineer sign off no concrete or si
BLD16-03440 BLD-Other8/16/20178/17/20178/17/2017 9:02:43 AMADEFR
Meet to walk Stage C competition, East side Chem rooms. Erik Holinka''s phone number above. Phone #: ###-#### Inspection requested via web by Joel Hartman