ELE17-02197
| Final | 8/16/2017 | 8/17/2017 | 8/17/2017 3:27:47 PM | P | FAIL |
|
|
We are requesting a final inspection for tomorrow afternoon. Our contact is Kory @ ###-####. Thank you! Phone #: ###-#### Inspection requested via web by Clint Tate 110.25 availaible fault current calc needed
|
ELE17-02675
| Final | 8/17/2017 | 8/17/2017 | 8/17/2017 3:25:33 PM | P | PASS |
|
|
A/C ready for final. Please call Jason at ###-#### if any questions. Phone #: ###-#### Inspection requested via web by Kelly Felin Final ok
|
ELE17-02541
| Electrical Rough-In | 8/16/2017 | 8/17/2017 | 8/17/2017 10:41:33 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Ryan Schaffer Garage and back room ok to cover
|
ELE13-02537
| Final | 8/16/2017 | 8/17/2017 | 8/17/2017 10:41:11 AM | A | PASS |
|
|
Please call Chuck to schedule access in the building for Sprint equipment. His number is listed above. Catholic Diocese Building. He prefers mornings rather than later, if there is a lock on the Sprint equipment that code is 1256.
Thank you, Phone #: ###-#### Inspection requested via web by Krista Ratterree Final ok
|
ELE17-01696
| Electrical Rough-In | 8/16/2017 | 8/17/2017 | 8/17/2017 8:50:06 AM | A | PASS |
|
|
This is an underground inspection. If you have any questions please call Clay ###-####. Thanks!! Phone #: ###-#### Inspection requested via web by Clay Morgan Conduit from house to shop ok to cover, will drive a ground rod later trench not deep enough for laying ground rod in...
|
ELE17-02609
| Permanent Service | 8/17/2017 | 8/17/2017 | 8/17/2017 8:30:35 AM | P | PASS |
|
|
p/s u/g rec ok
|
ELE17-02609
| Final | 8/16/2017 | 8/17/2017 | 8/17/2017 8:30:02 AM | A | CANC |
|
|
Service change, Installed 3 stack meter pack. Change out all 3 sub panels in units. All Garage doors will be able to lift up for access to panels. Need to be energized. Phone #: ###-#### Inspection requested via web by Douglas Hackney Just p/s at this time, will need final inspection once energized.....
|