BLD18-02486
| FIRE-Final Inspection | 8/15/2018 | 8/17/2018 | 8/17/2018 4:24:29 PM | P | PASS |
|
|
Final life fire safety inspection complete.
Jeb Phone #: ###-####
|
MIS18-00307
| BLD-Conference | 8/17/2018 | 8/17/2018 | 8/17/2018 3:23:00 PM | P | FAIL |
|
|
A correction notice was issued to obtain building permit for demo and possible work. Noted unit is being used as storage for flour and other misc. items. Also noted missing ceiling tiles at sprinkler head locations.
|
BLD18-02486
| BLD-Final | 8/15/2018 | 8/17/2018 | 8/17/2018 3:20:56 PM | P | PASS |
|
|
Jeb Phone #: ###-####. Ok for perm occ. All issues have been resolved.
|
BLD18-00800
| BLD-Energy code compliance | 8/17/2018 | 8/17/2018 | 8/17/2018 3:10:39 PM | P | PASS |
|
|
Exterior Rigid Insulation of Office Phone #: ###-#### Inspection requested via web by KJ Savaria
|
BLD17-03581
| BLD-Final | 8/17/2018 | 8/17/2018 | 8/17/2018 1:48:46 PM | P | PEND |
|
|
fire finals expected today. Thank you Michael McHargue Phone #: ###-#### Inspection requested via web by Mike McHargue. Walk through. Needs fire/life/safety and public works.
|
BLD17-04278
| BLD-Ceiling Grid Inspection | 8/16/2018 | 8/17/2018 | 8/17/2018 10:28:13 AM | A | PART |
|
|
Seth Phone #: ###-####. Needs to fireblock at top of walls.
|
BLD18-01900
| BLD-Foundation | 8/16/2018 | 8/17/2018 | 8/17/2018 9:21:28 AM | A | PART |
|
|
wall // Dane Phone #: ###-####
|
BLD18-02373
| BLD-Foundation | 8/16/2018 | 8/17/2018 | 8/17/2018 9:03:29 AM | A | PASS |
|
|
Rebar Inspection Phone #: ###-#### Inspection requested via web by Paul Panatopoulos
|
BLD18-02373
| BLD-Other | 8/16/2018 | 8/17/2018 | 8/17/2018 9:03:18 AM | A | PASS |
|
|
Setback inspection Phone #: ###-#### Inspection requested via web by Paul Panatopoulos
|