Inspections for the day of: Friday, August 18, 2000.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC00-02476 Final8/18/20008/18/20008/21/2000 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 08/18/2000 at 10:38:30. Contact: ###-####.Terminate pt with-in 6 inches of the fllor.c/n posted. 8/21/2000 12:21:34 PM
BLD99-03348 BLD-Final8/17/20008/18/20008/18/2000 12:00:00 AMAPART
Jim ###-#### Need final inspections reports mti/ engineer, also fire caulk upper mec room 2 hr wall. other signatures req. job crd. 8/18/2000 1:14:43 PM
BLD00-01407 BLD-Final8/17/20008/18/20008/18/2000 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 08/17/2000 at 10:04:15. Contact: ###-####. Prior framing correction exist in crawl cut joist, also post base and beam connections at ext patio. 8/18/2000 1:15:55 PM
BLD00-02049 BLD-Final8/17/20008/18/20008/18/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 08/17/2000 at 10:16:16. Contact: ###-####.
MEC00-02754 Rough-in8/17/20008/18/20008/18/2000 12:00:00 AMACANC
Paul ###-#### trans to 411. 8/18/2000 1:17:21 PM
MEC00-02030 Final8/17/20008/18/20008/18/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 08/17/2000 at 13:34:47. Contact: ###-####.
BLD00-01697 BLD-Framing/Rough-in8/17/20008/18/20008/18/2000 12:00:00 AMAPART
chris ###-#### this is for a shear inspection and a framing .needs plumbing mechanical before a frame c/n posted ok to side. 8/18/2000 3:00:28 PM
BLD99-03319 BLD-Framing/Rough-in8/17/20008/18/20008/18/2000 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 08/17/2000 at 15:09:01. Contact: .
BLD00-00591 BLD-Final8/17/20008/18/20008/18/2000 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 08/17/2000 at 18:12:20. Contact: ###-####. Needs plumbing and electric smoke detector 8/18/2000 10:07:15 AM
BLD00-02178 BLD-Foundation8/18/20008/18/20008/18/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 08/18/2000 at 00:51:30. Contact: ###-####. no approved plans,right side will require sting line to verify setback. 8/18/2000 1:16:50 PM
BLD00-01666 BLD-Energy code compliance8/18/20008/18/20008/18/2000 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 08/18/2000 at 09:46:34. Contact: ###-####. missing vapor barrier. 8/21/2000 8:53:59 AM
BLD00-01666 BLD-Framing/Rough-in8/18/20008/18/20008/18/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 08/18/2000 at 09:47:21. Contact: ###-####.
BLD00-01692 BLD-Energy code compliance8/18/20008/18/20008/18/2000 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 08/18/2000 at 11:07:37. Contact: ###-####. has c/n posted all not complete. 8/21/2000 8:54:44 AM
BLD00-01692 BLD-Conference8/18/20008/18/20008/18/2000 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 08/18/2000 at 11:08:04. Contact: ###-####.
BLD00-01362 BLD-Framing/Rough-in8/18/20008/18/20008/18/2000 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 08/18/2000 at 11:08:54. Contact: ###-####.ok to start some siding has c/n posted for areas.hds 8/21/2000 8:55:20 AM
BLD00-02247 BLD-Footing8/18/20008/18/20008/18/2000 12:00:00 AMPNR
tom ###-#### just started,setting up foarms. 8/21/2000 8:56:01 AM