FIR03-00152
| INSP-Sprinkler Rough-in/Hydro | 8/17/2003 | 8/18/2003 | 8/18/2003 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 8/17/2003 at 10:06:30 PM. Contact: ###-####. hydro on wet system okay 8/18/2003 11:02:03 AM
|
BLD02-02863
| FIRE-Conference | 8/18/2003 | 8/18/2003 | 8/18/2003 12:00:00 AM | P | PART |
|
|
met with Julio about requirements for the final inspection; saw smoke damper on 3rd floor not closed all the way; elevator won't have state sign off until Friday; fire alarm panel wasn't ready and the room sounder bases aren't temporal tone per Mark of Simplex; mag locks on doors aren't tied into fire alarm; exit sign weren't installed on first floor 8/18/2003 3:22:09 PM
|