MIS04-00164
| BLD-Final | 8/17/2004 | 8/18/2004 | 8/18/2004 12:00:00 AM | A | DONE |
|
|
gave papers to people on site 8/18/2004 11:07:09 AM
|
BLD04-00783
| BLD-Final | 8/17/2004 | 8/18/2004 | 8/18/2004 12:00:00 AM | A | NR |
|
|
Don ; phone # ###-####
|
MEC03-00191
| Final | 8/17/2004 | 8/18/2004 | 8/18/2004 12:00:00 AM | A | DONE |
|
|
from 8:00 a.m. to 1:00 p.m. if possible. Internet Inspection Request from: Aaron Alandt
must have been looked at already 8/18/2004 11:18:43 AM
|
BLD04-00256
| BLD-Final | 8/17/2004 | 8/18/2004 | 8/18/2004 12:00:00 AM | A | PASS |
|
|
###-#### dave
|
BLD04-01798
| BLD-Footing | 8/18/2004 | 8/18/2004 | 8/18/2004 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 8/18/2004 at 7:21:21 AM. Contact: ###-####.
|
BLD04-01801
| BLD-Footing | 8/18/2004 | 8/18/2004 | 8/18/2004 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 8/18/2004 at 7:22:22 AM. Contact: ###-####.
|
BLD04-01795
| BLD-Foundation | 8/18/2004 | 8/18/2004 | 8/18/2004 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 8/18/2004 at 7:23:20 AM. Contact: ###-####.
|
BLD04-01893
| BLD-Footing | 8/18/2004 | 8/18/2004 | 8/18/2004 12:00:00 AM | P | PART |
|
|
bob; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD04-01094
| BLD-Energy code compliance | 8/18/2004 | 8/18/2004 | 8/18/2004 12:00:00 AM | P | PASS |
|
|
dave-note: inspect installation; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD04-01261
| BLD-Framing/Rough-in | 8/18/2004 | 8/18/2004 | 8/18/2004 12:00:00 AM | P | FAIL |
|
|
ANTHONY; Phone #: ###-#### Internet Inspection Request from: Annette Moore
c/n posted,,, dont insulate 8/18/2004 2:59:20 PM
|
MIS04-00184
| BLD-Final | 8/18/2004 | 8/18/2004 | 8/18/2004 12:00:00 AM | P | DONE |
|
|
john - note: blg to moved to 5500 pierce pk; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
see bld###-####7 8/18/2004 3:21:04 PM
|
BLD04-01747
| BLD-Footing | 8/18/2004 | 8/18/2004 | 8/18/2004 12:00:00 AM | P | PART |
|
|
john; ph.# ###-####
wip,, dig out loose material prior to pouring 8/18/2004 3:20:25 PM
|
BLD04-01639
| BLD-Conference | 8/17/2004 | 8/18/2004 | 8/18/2004 12:00:00 AM | P | PART |
|
|
2:30 pm please///per your request
w/ Bob Arnold, soil eng.,,, owners,, Eric w/ economy concrete,,, #425, ,,, Excavator, other people,,,, digging along ftgs to verify soil bearing/compaction for design,,,, Bob will send letter of approval or fix 8/18/2004 3:31:06 PM
|