BLD05-00121
| BLD-Framing/Rough-in | 8/18/2005 | 8/18/2005 | 8/19/2005 9:48:18 AM | A | FAIL |
|
|
Phone #: ###-#### Internet Inspection Request from: Jay Story. complete nailing on simpson hangars. Air seal package complete. ok to insulate.
|
BLD05-01964
| BLD-Framing/Rough-in | 8/17/2005 | 8/18/2005 | 8/18/2005 3:50:52 PM | P | PART |
|
|
jay; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Awaiting paper work from engineer regarding two ply trus that is not nailed together. ok to insulate.
|
BLD05-00097
| BLD-Framing/Rough-in | 8/17/2005 | 8/18/2005 | 8/18/2005 3:49:30 PM | P | PART |
|
|
shear wall//don; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. All hold downs in place as per plans. All strapping in place and nailed as per plans. TONY- Check your box for the paper work approving the use og staples, 36 guage used 1 7/8 inches long. Gave ok to cover based on what contractor noted and noting that the patern was still over what he had noted. Paper work should be faxed by 8-19-05. Also had paper work on site.
|
BLD05-01968
| BLD-Framing/Rough-in | 8/17/2005 | 8/18/2005 | 8/18/2005 1:50:04 PM | P | NR |
|
|
please call a half hour prior to inspection for access dale; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Need elec. r.i. inspection.
|
BLD05-01059
| BLD-Foundation | 8/18/2005 | 8/18/2005 | 8/18/2005 1:31:50 PM | P | PASS |
|
|
wes; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
MIS05-00127
| BLD-Final | 8/17/2005 | 8/18/2005 | 8/18/2005 11:21:16 AM | A | CANC |
|
|
brian davis- ###-####. Did not pass fire insp.
|
BLD04-00909
| BLD-Final | 8/17/2005 | 8/18/2005 | 8/18/2005 11:18:03 AM | A | PASS |
|
|
mark ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD05-00768
| BLD-Foundation | 8/17/2005 | 8/18/2005 | 8/18/2005 10:49:46 AM | A | PART |
|
|
masonry block bond beam inspection/// anthony; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. need ok from engineer to grout wall solid.
|
BLD05-00771
| BLD-Foundation | 8/17/2005 | 8/18/2005 | 8/18/2005 10:48:58 AM | A | PART |
|
|
masonry block bond beam inspection/// anthony; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. need ok from engineer to grout wall solid.
|
BLD05-00879
| BLD-Framing/Rough-in | 8/18/2005 | 8/18/2005 | 8/18/2005 10:24:55 AM | A | PASS |
|
|
plans in fp ; Phone #: ###-#### Internet Inspection Request from: Erby Gonzales
|
BLD05-01863
| BLD-Foundation | 8/17/2005 | 8/18/2005 | 8/18/2005 9:23:08 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 8/17/2005 at 5:51:53 PM. Contact: ###-####.
|
BLD05-01005
| BLD-Foundation | 8/17/2005 | 8/18/2005 | 8/18/2005 9:01:28 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 8/17/2005 at 3:26:52 PM. Contact: ###-####.
|
BLD05-01001
| BLD-Foundation | 8/17/2005 | 8/18/2005 | 8/18/2005 9:01:11 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 8/17/2005 at 3:25:40 PM. Contact: ###-####.
|
BLD04-00909
| DOC - Permit Finaled | 8/18/2005 | 8/18/2005 | 8/18/2005 12:00:00 AM | P | PASS |
|
|
|