Inspections for the day of: Friday, August 18, 2006.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR06-00497 INSP-Final Inspection8/18/20068/18/20068/18/2006 4:40:43 PMPPASS
Sprinkler piping is ok to cover
FIR06-00554 INSP-Final Inspection8/18/20068/18/20068/18/2006 4:01:00 PMPPASS
Permit finaled
FIR06-00391 INSP-Final Inspection8/18/20068/18/20068/18/2006 3:37:43 PMPCANC
Per the contractor the fire alarm system is not ready for inspection yet.
FIR06-00213 INSP-Final Inspection8/17/20068/18/20068/18/2006 3:36:59 PMPCANC
The fire alarm system was not ready to final yet
BLD05-02821 FIRE-Final Inspection8/17/20068/18/20068/18/2006 3:34:26 PMAPASS
Life safety finaled. Contractor was on the way to pickup the occupant load sign
FIR06-00452 INSP-Sprinkler Rough-in/Hydro8/17/20068/18/20068/18/2006 2:16:05 PMAPASS
Canopy hydro test passed. The 24 hour air test was started at 1:30 with 45psi of air showing on the guage. A check vavle is missing in the air line and will need to be added.
FIR06-00561 INSP-Sprinkler Rough-in/Hydro8/17/20068/18/20068/18/2006 1:01:43 PMAPASS
sprinkler piping is ok to cover
FIR06-00299 INSP-Sprinkler Rough-in/Hydro8/17/20068/18/20068/18/2006 9:57:59 AMAPASS
underground hydro test passed.
BLD06-00577 FIRE-Final Inspection8/17/20068/18/20068/18/2006 9:42:38 AMAPASS
Life safety finaled
FIR06-00361 FIR-Aging Inspection8/18/20068/18/20068/18/2006 8:21:51 AM NR
Work is in progress per Robert Spinden
BLD05-02379 FIRE-Final Inspection8/18/20068/18/20068/18/2006 12:00:00 AMPCANC
per herb Note: also fire alarm; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles