Inspections for the day of: Monday, August 18, 2008.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD08-00193 FIRE-Final Inspection8/15/20088/18/20088/19/2008 10:12:56 AMAPASS
life safety passed
FIR08-00532 INSP-Final Inspection8/18/20088/18/20088/18/2008 4:10:21 PMPPASS
permit finaled
FIR08-00514 INSP-Sprinkler Rough-in/Hydro8/15/20088/18/20088/18/2008 3:05:37 PMAPASS
The underground supply line is ok to bury. The installation matches plans except that a 45 degree elbow as shown on the plans has been deleted with only the 90 elbow turning into the building remaining.
FIR08-00434 INSP-Sprinkler Rough-in8/15/20088/18/20088/18/2008 3:04:13 PMAPASS
The underground supply line is ok to bury. The contractor had already buried the thrust block at the in-building riser. I had them dig it out and it appears that it is adequate in size and placement.
FIR08-00279 INSP-Supply line flush8/15/20088/18/20088/18/2008 1:35:03 PMACANC
Need to cancel per Josh Phone #: ###-####
FIR08-00526 INSP-Sprinkler Rough-in8/15/20088/18/20088/18/2008 1:00:20 PMAPART
See the city approved plans for locations where the sprinkler piping rough-in passed. Work has been done in the southwest corner of the building which is not shown on the plans. Near this same location are new walls where the sprinkler protection will need to be modified and shown on a set of approved plans. Also the quick responce heads need to be changed to standard responce heads to match the other heads as per bruce and I's conversation.