Inspections for the day of: Monday, August 18, 2008.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC08-00508 BMP Violation8/13/20088/18/20088/19/2008 7:25:46 AMADEFR
Moved to 8/27/08.
CAS
ESC07-01547 General Inspection8/18/20088/18/20088/19/2008 7:24:44 AMPFAIL
Notice of Correction.
Change out RP to the RP with day to day conrtol.
Update ESC sign with the proper info.
Clean up gutter pan on the perimeter of the project.
Remove dirt off of the north east part of project where it is over flowing onto the handicap access of the sidewalk.
Will re-inspect on 8/20/08.
CAS
ESC08-00332 General Inspection8/18/20088/18/20088/18/2008 3:51:01 PMPPASS
Minor amounts of sediment in the street. No major isues present.
CAS
ESC08-00464 Conference8/18/20088/18/20088/18/2008 3:17:16 PMPDONE
Went over the issues with pervent violations with the project. Also with the phase of the pervious asphalt. Refered the RP to contact Bob Achibald over scheduling work in the evenings. Refered RP to Tom Dillan (ACHD Stormwater Specialist) over street washing.
CAS
ESC06-00287 Site Final8/18/20088/18/20088/18/2008 3:13:19 PMPPASS
ESC08-00625 BMP Violation8/18/20088/18/20088/18/2008 3:04:14 PMPFAIL
Noticee of Correction.
Left Message with RP.
1. Protect storm drain inlet with the approved inlet protection.
2. Clean up parking lot of all sediment.
Will re-inspect on 8/20/08.
Failure to comply will result in further enforcement.
CAS
ESC08-00315 Tracking Control8/12/20088/18/20088/18/2008 10:21:59 AMAPART
They are in the process of cleaning up the project area. Will re-inpsect on 8/22/08
ESC05-01334 Site Final8/18/20088/18/20088/18/2008 10:20:29 AMPPASS
All work is complete.
ESC06-00720 Site Final8/18/20088/18/20088/18/2008 10:20:05 AMPPASS
ESC06-00190 Site Final8/18/20088/18/20088/18/2008 10:19:12 AMPPASS
Site is stabilized.
ESC08-00474 General Inspection8/18/20088/18/20088/18/2008 10:16:56 AMAPASS
No tracking or any other issues. Site looks good.
ESC08-00457 Tracking Control8/18/20088/18/20088/18/2008 9:20:34 AMAPASS
Site has re-installed construction entrances with large 2-4" crushed rock to due the dirt moving that will be occuring on and off of project. Will be sweeping up all hard surfaces today. Will check up on 8/20/08
CAS
ESC08-00501 Site Preparation8/18/20088/18/20088/18/2008 8:27:54 AMPPASS
Site looks good.
ESC06-00271 BMP Violation8/14/20088/18/20088/18/2008 8:12:04 AMPCANC