ESC09-00276
| Site Final | 8/18/2009 | 8/18/2009 | 8/18/2009 4:08:40 PM | P | FAIL |
|
|
70% reveg. not achieved.
|
ESC09-00240
| Site Final | 8/18/2009 | 8/18/2009 | 8/18/2009 4:08:13 PM | P | FAIL |
|
|
70% reveg. not achieved.
|
BLD09-00680
| BLD-Final | 8/18/2009 | 8/18/2009 | 8/18/2009 4:07:41 PM | P | PASS |
|
|
rustin Phone #: ###-####
|
BLD09-00680
| DOC - Permit Finaled | 8/18/2009 | 8/18/2009 | 8/18/2009 4:07:30 PM | P | PASS |
|
|
Cert. of occ. was issued.
|
BLD09-00752
| BLD-Final | 8/18/2009 | 8/18/2009 | 8/18/2009 4:06:57 PM | P | PASS |
|
|
rustin Phone #: ###-####
|
BLD09-00752
| DOC - Permit Finaled | 8/18/2009 | 8/18/2009 | 8/18/2009 4:06:48 PM | P | PASS |
|
|
Cert. of occ. issued.
|
BLD09-00079
| BLD-Final | 8/18/2009 | 8/18/2009 | 8/18/2009 2:18:55 PM | P | NR |
|
|
Rustin Phone #: ###-####. Needs elec. final first.
|
ESC09-00459
| Site Preparation | 8/18/2009 | 8/18/2009 | 8/18/2009 2:18:11 PM | P | PASS |
|
|
|
BLD09-01250
| BLD-Framing/Rough-in | 8/18/2009 | 8/18/2009 | 8/18/2009 2:17:57 PM | P | CANC |
|
|
Mick Phone #: ###-####
|
BLD09-01250
| BLD-Conference | 8/18/2009 | 8/18/2009 | 8/18/2009 2:17:51 PM | P | DONE |
|
|
Mick Phone #: ###-####
|
BLD09-01062
| BLD-Other | 8/18/2009 | 8/18/2009 | 8/18/2009 2:17:28 PM | P | NR |
|
|
ceiling cover south of gridline 3.5 please Phone #: ###-#### Internet Inspection Request from: John Lodman
|
BLD09-00584
| BLD-Final | 8/17/2009 | 8/18/2009 | 8/18/2009 2:17:11 PM | A | PASS |
|
|
kevin Phone #: ###-####
|
BLD09-00584
| DOC - Permit Finaled | 8/18/2009 | 8/18/2009 | 8/18/2009 2:16:44 PM | P | PASS |
|
|
|
ESC08-01049
| General Inspection | 8/18/2009 | 8/18/2009 | 8/18/2009 11:01:24 AM | A | FAIL |
|
|
Needs to pick up all const. debries from yard. verbal c/n to RP.
|
BLD09-01316
| BLD-Framing/Rough-in | 8/17/2009 | 8/18/2009 | 8/18/2009 11:00:39 AM | A | FAIL |
|
|
Aaron-please call for access information Phone #: ###-####. Needs fix for B1G gable end truss, at carport, requires full bearing at bootom chord, provide straps on 4x8 header and strap at plumbing were floor joist was cut. ok to insul.
|
ESC09-00527
| Site Preparation | 8/18/2009 | 8/18/2009 | 8/18/2009 10:12:41 AM | A | PASS |
|
|
ESC permit sign posted. BMP's in place. Contractor noted tha thtey will provide a washout "tub" for concrete. All excavated soils are contained in backyard.
|
BLD09-01401
| BLD-Footing | 8/17/2009 | 8/18/2009 | 8/18/2009 10:11:00 AM | A | PASS |
|
|
tim Phone #: ###-####
|
BLD09-00471
| BLD-Final | 8/17/2009 | 8/18/2009 | 8/18/2009 9:32:27 AM | A | FAIL |
|
|
Mike Phone #: ###-####. Mirror has been lowered. Boot under sink not present at time of inspection.
|
ESC09-00369
| Random Inspection | 8/18/2009 | 8/18/2009 | 8/18/2009 9:04:49 AM | A | PASS |
|
|
ESC permit sign posted. BMP's in place. Construction enterance is being maintained. No trackout noted. General site conditions were good.
|
BLD09-01024
| BLD-Concrete | 8/17/2009 | 8/18/2009 | 8/18/2009 9:03:28 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 8/17/2009 at 3:14:28 PM. Contact: ###-####. Concrete tilt panels. Noted incorrect pier spacing on N1 and N2 panels. Noted to contractor to specialinspector note on report that these two panels were repaired.
|
ESC07-01046
| Site Final | 8/18/2009 | 8/18/2009 | 8/18/2009 7:10:47 AM | A | PASS |
|
|
Final stabalization has been completed.
|
ESC07-01038
| Site Final | 8/18/2009 | 8/18/2009 | 8/18/2009 7:10:21 AM | A | PASS |
|
|
Final stbalization has been completed.
|
ESC07-01059
| Random Inspection | 8/18/2009 | 8/18/2009 | 8/18/2009 7:08:50 AM | A | PASS |
|
|
|