Inspections for the day of: Wednesday, August 18, 2010.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR04-00634 INSP-Final Inspection8/12/20108/18/20108/20/2010 11:23:27 AMAPASS
Permit finaled
FIR10-00322 INSP-Sprinkler Rough-in/Hydro8/18/20108/18/20108/18/2010 3:14:32 PMPPASS
The overhead hydro test passed and the remaining sprinkler piping can be covered. One earthquake bracing was not installed but was installed by the end of the hydro test.
FIR09-00060 INSP-Final Inspection8/18/20108/18/20108/18/2010 3:04:15 PMPPASS
Permit finaled.
FIR09-00060 FIR-Aging Inspection8/18/20108/18/20108/18/2010 3:03:23 PM PASS
FIR10-00224 FIR-Aging Inspection8/18/20108/18/20108/18/2010 3:00:20 PM NR
Work is in progress
FIR10-00099 INSP-Final Inspection8/16/20108/18/20108/18/2010 2:53:51 PMPFAIL
The technician did not have a monitor to verify the Netcon so no testing was performed. I noted that the duct smoke detectors set the panel into alarm but there are no notification devices. These will need to report as supervisory. Tim and I spoke about getting this changed.
BLD10-01273 FIRE-Final Inspection8/17/20108/18/20108/18/2010 1:42:06 PMAFAIL
This inspection was actually a conference for the placement of exit signs and emergency lighting in the warehouse area. The architect provided a stamped plan, which I field approved, for the placement of the new devices. I turned in two copied to tim woodard for our permanant record.
FIR10-00287 INSP-Sprinkler Rough-in8/18/20108/18/20108/18/2010 1:37:07 PMPPASS
Underground rough to cover inspection. The underground supply piping is ok to cover. The city approved plans indicate 1 1/4" piping but the contractor has installed 1 1/2".
BLD10-01551 FIRE-Final Inspection8/18/20108/18/20108/18/2010 10:32:16 AMPPASS
Life safety passed