Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR11-00265 INSP-Sprinkler Rough-in8/16/20118/18/20118/18/2011 5:52:22 PMACANC
Overbooked.
FIR11-00281 INSP-Sprinkler Rough-in8/16/20118/18/20118/18/2011 5:48:53 PMACANC
Overbooked.
FIR11-00325 INSP-Sprinkler Rough-in8/16/20118/18/20118/18/2011 5:47:43 PMAFAIL
Riser supervision incorrectly reported as 2nd floor HVAC supervisory. Also noted an inoperable MP station and SD at the riser room.
FIR11-00213 INSP-Sprinkler Rough-in8/16/20118/18/20118/18/2011 5:40:04 PMAPASS
Scope of quick permit work passed field inspection. Fire alarm permit finaled.
FIR11-00212 INSP-Final Inspection8/15/20118/18/20118/18/2011 5:32:27 PMAPART
Items which remain for final include; provide spare heads at the head box of the type installed, certify the DCVA, re-test alarm and supervisory conditions at the riser. Final walkthrough completed acceptable.
FIR11-00211 INSP-Final Inspection8/15/20118/18/20118/18/2011 5:23:36 PMAPASS
Scope of fire sprinkler work passed final walkthrough. Permit finaled.
FIR11-00026 INSP-Final Inspection8/17/20118/18/20118/18/2011 4:02:58 PMAPART
Completed testing for ID and DD at the 1st, 2nd, 3rd floor and roof. Noted address changes at two ID on the first floor and the two RTU's AC1 and AC2. IP-DACT per plan has not been installed- phone lines have been provided interm.
FIR11-00221 INSP-Sprinkler Rough-in/Hydro8/18/20118/18/20118/18/2011 3:56:16 PMPPART
UG fire supply line hydrostatic test passed.
FIR10-00540 INSP-Final Inspection8/17/20118/18/20118/18/2011 2:15:42 PMAPART
FIR11-00139 INSP-Final Inspection8/17/20118/18/20118/18/2011 2:14:14 PMACANC
Overbooked
BLD08-01071 FIRE-Final Inspection8/17/20118/18/20118/18/2011 2:02:48 PMAPART
Life safety inspection completed for unit 531. Noted existing fire extinguishers are overdue annual certification by two months.
BLD11-01134 FIRE-Final Inspection8/16/20118/18/20118/18/2011 1:59:48 PMAPASS
Reinspection completed acceptable. Verified functional smoke alarms at adjacent apt. units. Life safety passed.
FIR11-00391 INSP-Sprinkler Rough-in/Hydro8/18/20118/18/20118/18/2011 1:55:33 PMPPART
Modifications per the scope of work are approved for cover at both the grid and sheetrock ceiling areas.
FIR11-00341 INSP-Sprinkler Rough-in8/18/20118/18/20118/18/2011 1:52:57 PMPPART
Overhead rough-in at the new restrooms as marked on approved plan set with today's date are approved for ceiling cover.