Inspections for the day of: Monday, August 18, 2014.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC13-00777 General Inspection8/18/20148/18/20148/18/2014 4:53:17 PM PASS
Finaled.
ESC13-00777 DOC - Permit Finaled8/18/20148/18/20148/18/2014 4:49:02 PMPPASS
Construction activity is complete on the exterior. ESC conditions satisfied.
ESC13-00909 General Inspection8/18/20148/18/20148/18/2014 4:32:27 PM PART
Old parking lot asphalt has been removed. New lot has been graded but is awaiting pavement and landscaping. Some minor trackout to Cassia and sediment in gutter directly in front of work area is present. Need to sweep up after parking lot is paved.
ESC13-00213 General Inspection8/18/20148/18/20148/18/2014 4:22:03 PM CANC
rescheduled for 8/19
ESC13-00471 Aging Inspection8/18/20148/18/20148/18/2014 4:04:04 PM FAIL
Swales are filled with sediment and debris. There has been no work done by JH development or Sunrise Development as stated. Will reinspect this week to issue corrections to individual SFH projects.
ESC13-01279 Complaint Inspection8/18/20148/18/20148/18/2014 3:50:22 PMAFAIL
3 corrections required to be completed end of day Tuesday 8/19:

1. Sweep and remove rocks, gravel, and sediment around the intersection of Eckart and Arrow Junction.
2. Empty and replace drop inlet sediment filter bags on all stormdrains around site.
3. Maintain wattles on Eckart south of construction entrance.
ESC13-00230 General Inspection8/18/20148/18/20148/18/2014 3:44:10 PM PASS
RH #5 currently in compliance. No trackout, illicit discharges, or violations observed. BMPs are being maintained.
ESC13-00259 Aging Inspection8/18/20148/18/20148/18/2014 3:31:10 PM PASS
Triplett Ranch individual townhomes in progress. Hillsides have stabilized/revegetated around the retaining wall. Will keep permit open to check up on temporary BMPs.
ESC14-00635 Site Preparation8/18/20148/18/20148/18/2014 3:08:17 PMPPASS
site prep inspection Noah @ 2:00 PM

Met RP Noah onsite. Project is at the rear of the existing building. Stockpiles are to be off-hauled once foundation (slab on grade) is dug, will protect stockpiles if left onsite.

Nearest downstream MS4 DI is on 6th street and Franklin. Sheet flow goes to alley and landscaped area next to project. Permit posted on fence. Construction will begin tomorrow.
ESC14-00109 DOC - Permit Finaled8/18/20148/18/20148/18/2014 12:58:32 PMPPASS
ESC permit conditions satisfied. Scope of this project (covering Penitentiary Canal) is complete. Sub development to be covered under ESC14-00788.
ESC13-00513 Aging Inspection8/18/20148/18/20148/18/2014 9:19:03 AM PASS
ESC14-00011 General Inspection8/18/20148/18/20148/18/2014 9:04:32 AM PASS
Finaled.
ESC14-00011 DOC - Permit Finaled8/18/20148/18/20148/18/2014 9:04:20 AMPPASS
Project complete. Construction activities and materials no longer at site. ESC conditions satisfied.