ELE10-01638
| ELE-Aging Inspection | 8/18/2016 | 8/18/2016 | 8/25/2016 2:50:18 PM | | PASS |
|
|
Waiting on owner fee will apply to future notices.
|
ELE16-00089
| Electrical Rough-In | 8/18/2016 | 8/18/2016 | 8/18/2016 2:21:52 PM | P | PASS |
|
|
Call Bob for inspection of walls at 4th floor pre-function/ballroom doorways. Inspection of ceiling grid in meeting rooms 410 and 424. Phone #: ###-#### Inspection requested via web by Rafael Castillo areas noted pluse south wall and ballroom as noted on print. ok to cover
|
ELE16-01838
| Electrical Rough-In | 8/17/2016 | 8/18/2016 | 8/18/2016 12:40:17 PM | P | PASS |
|
|
level 2 annex auditorium ceiling inspection. Call John Phone #: ###-#### Inspection requested via web by Brandon Robinson ceiling in auditorium ok to cover. Drop screen motors to be cord and plug for disc.
|
ELE15-01348
| Electrical Rough-In | 8/17/2016 | 8/18/2016 | 8/18/2016 12:38:24 PM | P | PASS |
|
|
Level 1,3,5,7,9 Life Safety 480/ 120-208 Xfmrs and Branch Circuit Panels
Level 2,4,6,8 EQ. Branch 480/120-208 Xfmers and Branch Circuit Panels Phone #: ###-#### Inspection requested via web by Tom Betty area noted roughin ok
|
ELE15-01348
| Electrical Rough-In | 8/17/2016 | 8/18/2016 | 8/18/2016 12:36:08 PM | A | PASS |
|
|
BUSSDUCT BDAA, BDBB, BDCC. associated Bussduct disconnects,480/277 Panels , 480/120-208 xfmers,Branch circuit panels and subpanels ALL NORMAL POWER Phone #: ###-#### Inspection requested via web by Tom Betty for final extensions for disc over 6'7, complete labeling of equiptment. floors 1-5 ok, and 6-9 still terminating. Gentlemen with Hoffman engineering was asking if a lock could be placed on disconnects related to septic systems power. There will be maintenance personnel onsite if needed open.
|
ELE16-02677
| Conference | 8/17/2016 | 8/18/2016 | 8/18/2016 10:04:22 AM | A | DONE |
|
|
Mitch Phone #: ###-#### Discussion on remodel and new panel location. New service location to be moved and located out of the area of the steps to allow for safe working space. Overhead clearences. Interior work had open splices on knob and tube. Contractor to addess as needed. Mentioned to contractor that any knob and tube wiring left to be used cannot be in contact with insulation.
|
ELE16-01895
| Final | 8/18/2016 | 8/18/2016 | 8/18/2016 10:04:21 AM | A | PASS |
|
|
CODE 1234 Phone #: ###-#### Inspection requested via web by Bob Glenn
|
ELE16-01134
| Electrical Rough-In | 8/17/2016 | 8/18/2016 | 8/18/2016 12:00:00 AM | A | PASS |
|
|
We are requesting a rough-in inspection for stairwell 1 for tomorrow Aug. 18th in the morning. Our onsite contract is Bobby @ ###-####. Thank you, Phone #: ###-#### Inspection requested via web by Clint Tate stair 1 5th floor roughin ok for cover. Covered prior to inspect informed if happens again will be required to uncover.
|
ELE16-02684
| Conference | 8/17/2016 | 8/18/2016 | 8/17/2016 1:21:11 PM | A | DONE |
|
|
Conference to walk through the disaster of a job. The house is occupied so were trying our darnedest to get power back up and running. House is on the corner overland and Robert just East of Vista behind the Atomic salon Phone #: ###-#### Inspection requested via web by Greg Traudt Existing panel in house over staiway allowed to remain. Service damage repair required. Service on pole in backyard to sub feed house.
|