BLD14-03207
| BLD-Conference | 8/18/2016 | 8/18/2016 | 8/19/2016 6:54:08 AM | P | CANC |
|
|
Ongoing walks of GBAD areas, stairs, walls for cover. Contact Adam when available. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD15-02707
| BLD-Conference | 8/18/2016 | 8/18/2016 | 8/19/2016 6:53:58 AM | P | DEFR |
|
|
Stair tower 1 from level 5 to level 6. SI is scheduled for pour and is on site this morning. Concrete scheduled for 2:30 pm. SI will be present for pour. Phone #: ###-#### Inspection requested via web by Jim Williams
|
BLD15-02368
| BLD-Final | 8/17/2016 | 8/18/2016 | 8/18/2016 8:25:59 PM | P | PART |
|
|
Nathan Phone #: ###-####. Ok for temp occ. on 9th. floor only.
|
BLD15-02368
| BLD-Ceiling Grid Inspection | 8/18/2016 | 8/18/2016 | 8/18/2016 3:50:37 PM | P | PASS |
|
|
Just to follow up from inspection performed earlier this week. 9th floor ceiling grid at CW TI. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD16-01340
| BLD-Framing/Rough-in | 8/18/2016 | 8/18/2016 | 8/18/2016 3:50:14 PM | P | NR |
|
|
Framing inspections so we can install siding only Phone #: ###-#### Inspection requested via web by Vaughn Pruett. Needs elec. rough in inspection.
|
BLD16-00476
| BLD-Final | 8/18/2016 | 8/18/2016 | 8/18/2016 2:00:24 PM | P | PASS |
|
|
Kelly Phone #: ###-####
|
BLD16-00476
| DOC - Permit Finaled | 8/18/2016 | 8/18/2016 | 8/18/2016 2:00:16 PM | P | PASS |
|
|
|
ESC16-00516
| Site Final | 8/18/2016 | 8/18/2016 | 8/18/2016 1:20:46 PM | P | DONE |
|
|
|
ESC16-00516
| DOC - Permit Finaled | 8/18/2016 | 8/18/2016 | 8/18/2016 1:20:25 PM | P | PASS |
|
|
|
BLD16-01279
| BLD-Final | 8/18/2016 | 8/18/2016 | 8/18/2016 1:19:57 PM | P | PASS |
|
|
Gail Phone #: ###-####
|
BLD16-01279
| DOC - Permit Finaled | 8/18/2016 | 8/18/2016 | 8/18/2016 1:19:32 PM | P | PASS |
|
|
|
BLD16-02487
| BLD-Final | 8/17/2016 | 8/18/2016 | 8/18/2016 11:25:22 AM | A | PASS |
|
|
Call Jason Reisinger. Phone #: ###-#### Inspection requested via web by Ami Tracy
|
BLD16-02487
| DOC - Permit Finaled | 8/18/2016 | 8/18/2016 | 8/18/2016 11:25:17 AM | P | PASS |
|
|
. OK for perm occ.
|
BLD16-02774
| BLD-Final | 8/17/2016 | 8/18/2016 | 8/18/2016 11:24:32 AM | A | NR |
|
|
Jason Phone #: ###-####. Nees life/safety final. Caleed Jason at provided number and left a voice messege noting to schedule a life/safety final.
|
BLD16-00172
| BLD-Energy code compliance | 8/17/2016 | 8/18/2016 | 8/18/2016 10:36:54 AM | A | PART |
|
|
David Phone #: ###-####. Ok to rock exterior walls(west and south west ends) 2nd. floor only. Contractor to send RFI for insulation between top of wall and bottom of 3rd. floor.
|
MIS16-00260
| BLD-Conference | 8/17/2016 | 8/18/2016 | 8/18/2016 9:19:02 AM | A | PASS |
|
|
possible re-roof being done without a permit
|
MIS16-00260
| DOC - Permit Finaled | 8/18/2016 | 8/18/2016 | 8/18/2016 9:18:55 AM | P | PASS |
|
|
A roofing permit has been issued.
|
BLD16-02494
| BLD-Final | 8/17/2016 | 8/18/2016 | 8/18/2016 9:17:53 AM | A | NR |
|
|
would like call ahead; Ben Phone #: ###-####. Needs fire/life/safety, CDHD and zoning finals.
|
BLD16-02361
| BLD-Wall Bracing | 8/17/2016 | 8/18/2016 | 8/18/2016 9:17:14 AM | A | PASS |
|
|
Feel free to call and I''d be happy to meet other here! Phone #: ###-#### Inspection requested via web by Andy Thompson
|