MIS17-00139
| BLD-Conference | 8/18/2017 | 8/18/2017 | 8/18/2017 12:00:00 AM | A | PEND |
|
|
Once water service is provided to site (Eagle Water) owner can apply for a land division which will be an administrative approval with zoning. After approval building permits shall be obtained to place the two structures permanently.
|