ELE98-02810
| INSP - Electrical Rough-In | 8/18/1998 | 8/19/1998 | 8/19/1998 12:00:00 AM | A | PASS |
|
|
david ###-#### GARAGE R/I. OK
|
ELE98-02835
| INSP - Final | 8/18/1998 | 8/19/1998 | 8/19/1998 12:00:00 AM | A | N.R. |
|
|
BILLIE ###-#### CONTRACTOR WILL RESCHEDULE. OK
|
ELE98-02840
| INSP - Electrical Rough-In | 8/18/1998 | 8/19/1998 | 8/19/1998 12:00:00 AM | A | PASS |
|
|
wade ###-#### 3-ROOM REMODEL. OK
|
ELE98-02841
| INSP - Final | 8/18/1998 | 8/19/1998 | 8/19/1998 12:00:00 AM | A | PASS |
|
|
PAGER ###-#### GARYS PAGER KITCHEN REMODEL. OK
|
ELE97-04313
| INSP - Electrical Rough-In | 8/18/1998 | 8/19/1998 | 8/19/1998 12:00:00 AM | A | PART |
|
|
open sheetrock area gene ###-#### first unit on the left when you get off the elavator on the 15th floor unit number on the floor in black inside the door
|
ELE98-02196
| INSP - Final | 8/19/1998 | 8/19/1998 | 8/19/1998 12:00:00 AM | P | PASS |
|
|
###-#### ROWDY
|
ELE98-02618
| INSP - Electrical Rough-In | 8/19/1998 | 8/19/1998 | 8/19/1998 12:00:00 AM | P | PART |
|
|
Scheduled by Hello!. Contact phone is [8882523]. CEILING R/I.
|