BLD01-00172
| BLD-Conference | 8/19/2002 | 8/19/2002 | 8/19/2002 12:00:00 AM | | PASS |
|
|
needs an extension ###-#### david; 8/19/2002 11:27:51 AM will chk w/ rita or linda. 8/19/2002 11:33:50 AM
|
BLD02-01697
| BLD-Conference | 8/19/2002 | 8/19/2002 | 8/19/2002 12:00:00 AM | A | PASS |
|
|
grid removed, need consult w/ fire insp re sprinkler locations
|
BLD02-01696
| BLD-Final | 8/19/2002 | 8/19/2002 | 8/19/2002 12:00:00 AM | A | PASS |
|
|
grid demo done
|
BLD02-00798
| BLD-Conference | 8/19/2002 | 8/19/2002 | 8/19/2002 12:00:00 AM | P | PASS |
|
|
w/ bldr & HVAC re occ. sep, framing, etc.
|
BLD02-00967
| BLD-Conference | 8/16/2002 | 8/19/2002 | 8/19/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 08/16/2002 at 14:38:35. Contact: ###-####...need plan, unable to verify site as doors security locked. recall. 8/20/2002 7:45:11 AM
|
BLD02-01623
| BLD-Final | 8/16/2002 | 8/19/2002 | 8/19/2002 12:00:00 AM | P | PASS |
|
|
###-#### GREG, rec'd eng's ok, looks good. 8/19/2002 4:45:42 PM
|
BLD01-00011
| BLD-Conference | 8/16/2002 | 8/19/2002 | 8/19/2002 12:00:00 AM | P | PASS |
|
|
darrel....gave flood cert to Steve M. 8/20/2002 9:44:06 AM
|
BLD01-00808
| BLD-Final | 8/16/2002 | 8/19/2002 | 8/19/2002 12:00:00 AM | P | PASS |
|
|
9419372 ...apts ok; canopy(ies) at entries to be completed thru BOI-ADA Housing Authority....not req'd to be type 1 construction (as previously noted on plans) 8/20/2002 1:31:30 PM
|
BLD01-00809
| BLD-Final | 8/16/2002 | 8/19/2002 | 8/19/2002 12:00:00 AM | P | PASS |
|
|
###-####
|
BLD02-00798
| BLD-Footing | 8/19/2002 | 8/19/2002 | 8/19/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 08/19/2002 at 07:42:58. Contact: ###-####. ext pop-out at front ok. 8/19/2002 4:27:13 PM
|