MEC02-01860
| Final | 8/16/2002 | 8/19/2002 | 8/19/2002 12:00:00 AM | A | PASS |
|
|
Verbal re-quest between Merle TML and Alan Houser for Fri afternoon. Stan ###-####. Thanks!; Phone #: ###-####
|
MEC02-01575
| Rough-in | 8/16/2002 | 8/19/2002 | 8/19/2002 12:00:00 AM | A | PART |
|
|
duct installed ok, need to finish rest, left c/n with super 8/19/2002 10:26:11 AM
|
MEC02-00527
| Final | 8/16/2002 | 8/19/2002 | 8/19/2002 12:00:00 AM | A | PASS |
|
|
###-####
|
MEC02-00523
| Final | 8/16/2002 | 8/19/2002 | 8/19/2002 12:00:00 AM | A | PASS |
|
|
|
MEC02-02216
| Final | 8/16/2002 | 8/19/2002 | 8/19/2002 12:00:00 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Michelle Evans
|
MEC02-02301
| Rough-in | 8/16/2002 | 8/19/2002 | 8/19/2002 12:00:00 AM | A | FAIL |
|
|
duct in basement not finished, cans at floor not finished, most doors in basement locked, no one on site 8/19/2002 10:08:33 AM
|
MEC02-02109
| Final | 8/19/2002 | 8/19/2002 | 8/19/2002 12:00:00 AM | P | NR |
|
|
ok for ceiling tile, no access to roof that i could find 8/19/2002 2:20:56 PM
|
MEC02-02306
| Rough-in | 8/19/2002 | 8/19/2002 | 8/19/2002 12:00:00 AM | P | PASS |
|
|
BJ ; Phone #: ###-####
|
MEC02-02306
| Pressure Test | 8/19/2002 | 8/19/2002 | 8/19/2002 12:00:00 AM | P | PASS |
|
|
BJ ; Phone #: ###-####
|
MEC02-02220
| Final | 8/19/2002 | 8/19/2002 | 8/19/2002 12:00:00 AM | P | PASS |
|
|
Call Chad. Thanks; Phone #: ###-####
|
MEC01-03519
| Conference | 8/16/2002 | 8/19/2002 | 8/16/2002 9:13:08 AM | A | CANC |
|
|
Internet Inspection Request from: Becky Sucher Inspection cancelled from web by: Becky Sucher
|