ELE05-01789
| ELE-Aging Inspection | 8/19/2005 | 8/19/2005 | 8/24/2005 8:14:32 AM | | DONE |
|
|
|
ELE05-02676
| Conference | 8/18/2005 | 8/19/2005 | 8/22/2005 4:31:43 PM | A | DONE |
|
|
talked with state elevator inspector and electrical contractor will post post correction , light and recept in elevator equip rm shall be dedicated circuit, and terminate flex from new cabinet to equip
|
ELE05-03001
| Permanent Service | 8/19/2005 | 8/19/2005 | 8/19/2005 3:25:49 PM | P | NH |
|
|
lee white ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie called gate locked had no access contractor will reschedule, and provide access
|
ELE05-03052
| Permanent Service | 8/19/2005 | 8/19/2005 | 8/19/2005 2:58:26 PM | P | PASS |
|
|
100 amp service upgrade Internet Inspection Request from: Andy Rose p/s o/h rec. ok
|
ELE05-03025
| Conference | 8/18/2005 | 8/19/2005 | 8/19/2005 2:30:58 PM | P | DONE |
|
|
scott; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ok
|
ELE05-01453
| Final | 8/19/2005 | 8/19/2005 | 8/19/2005 1:16:50 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 8/19/2005 at 7:53:46 AM. Contact: ###-####. ok called alan he will bond roof metal to spa
|
ELE05-03050
| Temporary Service | 8/19/2005 | 8/19/2005 | 8/19/2005 12:41:22 PM | P | PASS |
|
|
rick ###-#### t/s u/g new ok
|
ELE05-03049
| Temporary Service | 8/19/2005 | 8/19/2005 | 8/19/2005 12:40:57 PM | P | PASS |
|
|
rick ###-#### t/s u/g new ok
|
ELE05-03022
| Electrical Rough-In | 8/18/2005 | 8/19/2005 | 8/19/2005 10:43:41 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 8/18/2005 at 2:14:27 PM. Contact: ###-####. walls
|
ELE05-03023
| Electrical Rough-In | 8/18/2005 | 8/19/2005 | 8/19/2005 10:43:23 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 8/18/2005 at 2:15:59 PM. Contact: ###-####. wallsok
|
ELE05-02276
| Final | 8/18/2005 | 8/19/2005 | 8/19/2005 10:09:34 AM | A | FAIL |
|
|
Phone #: ###-#### Internet Inspection Request from: Lee VanSchoiack cor.posted called 250.8 no SMS, 680.26(C) bond cover rails and shall not use alum. lugs,, called left message
|
ELE05-03038
| Final | 8/18/2005 | 8/19/2005 | 8/19/2005 9:05:23 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 8/18/2005 at 1:58:44 PM. Contact: ###-####. see added conference
|
ELE05-03038
| Conference | 8/19/2005 | 8/19/2005 | 8/19/2005 12:00:00 AM | A | DONE |
|
|
Scheduled by a contractor via Hello! on 8/18/2005 at 1:58:44 PM. Contact: ###-####. ok
|
ELE05-03052
| Final | 8/19/2005 | 8/19/2005 | 8/19/2005 12:00:00 AM | P | PASS |
|
|
100 amp service upgrade Internet Inspection Request from: Andy Rose ok
|