Inspections for the day of: Friday, August 19, 2005.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBob Reichert
TitleELE-INSPECTOR
Phone #794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE05-02183 Final8/19/20058/19/20058/19/2005 4:24:11 PMPPASS
tim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok to final
ELE05-01399 Electrical Rough-In8/18/20058/19/20058/19/2005 4:23:31 PMPPASS
Scheduled by a contractor via Hello! on 8/18/2005 at 3:20:33 PM. Contact: ###-####. ok to cover ceiling, tails for office furniture ok 3 places
ELE05-03039 Temporary Service8/18/20058/19/20058/19/2005 2:49:43 PMPPASS
Phone #: ###-#### Internet Inspection Request from: Barbara Szurgot called contr about abrasion prot for gec. t/s u/g n ok
ELE05-03041 Electrical Rough-In8/18/20058/19/20058/19/2005 1:44:18 PMPPASS
###-#### - henry met elect, left survey,210.52 (D) recpt shall be within 3' of bath basin,314.17(C) nm shall be stapled within 8" of box, 334.30 nm cable shall be stapled within 12" of box, ric ok
ELE05-03051 Electrical Rough-In8/19/20058/19/20058/19/2005 10:42:59 AMPCANC
mike-- ###-#### Inspection cancelled from web by: Marsha Smylie
ELE03-03037 Final8/18/20058/19/20058/19/2005 10:41:42 AMAPART
Scheduled by a contractor via Hello! on 8/18/2005 at 2:53:09 PM. Contact: ###-####. checked main control room, j-b0xes, added items to fix: 430.102(B) disconnects shall be in sight of motors,352.30(A) rnc shall be supported within 3' of cnd body, need to see cable tray and 3rd party eval needs to commence. will be called back next week.
ELE05-01396 Final8/18/20058/19/20058/19/2005 9:15:50 AMACANC
lynn or mike ###-####///please call when on way to meet; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa called contr about straps and clearance. ok to final
ELE05-01346 Final8/18/20058/19/20058/19/2005 8:57:13 AMAFAIL
Scheduled by a contractor via Hello! on 8/18/2005 at 12:14:25 PM. Contact: ###-####. told contr, left corr notice,605.3 wireways shall be free of projections that may damage conductor insulation(power, comm),605.4 partitions shall be connrcted with strain relief, 605.2(B) all nec articles apply and shall be adhered to(close openings,secure covers,provide plates for conduit fittings, comm. protection)
ELE05-02586 Final8/18/20058/19/20058/19/2005 8:34:44 AMAPASS
Phone #: ###-#### Internet Inspection Request from: Kristopher wilson corrections made, ok to final
ELE04-02516 Final8/18/20058/19/20058/19/2005 12:00:00 AMPCANC
please call 15 min prior///mike; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa///cancelled per michael already talked to Bob//8/19/05 LEM 2:17pm