FIR05-00186
| INSP-Alarm Testing | 8/18/2005 | 8/19/2005 | 8/19/2005 3:18:43 PM | P | PART |
|
|
All that was tested today and passed was the phone lines, battery draw, the smoke detector above the main facp and the interconnection between the fire alarm panel and the NAC panels. What did not pass today was the loss of a/c power was not detected on the stagecoach NAC panel and the NAC panels are not labeled to match the map and the plans. They need to show up on the panel as #1, #2 and #3. Also loss of batteries comes in labeled as a gate valve. These points between the NAC's and the main facp need to be retested to verify that the description/device matches the action. Per the alarm contractor the tamper switch in the pit is off line due to construction of a water line that damaged that part of the circuit.
|
BLD03-03031
| FIRE-Final Inspection | 8/18/2005 | 8/19/2005 | 8/19/2005 3:07:45 PM | P | FAIL |
|
|
Still need to verify that the sprinkler spacing in the conference room and the additional dry pendants are approved with resubmittals. When the fire sprinkler permit is finaled the life safety can be finaled since items have been checked.
|
FIR05-00189
| INSP-Final Inspection | 8/19/2005 | 8/19/2005 | 8/19/2005 3:01:29 PM | P | PASS |
|
|
Fire alarm permit finaled
|
FIR05-00259
| INSP-Sprinkler Rough-in/Hydro | 8/18/2005 | 8/19/2005 | 8/19/2005 2:06:28 PM | P | PASS |
|
|
hydro test for overhead passed
|
FIR05-00478
| INSP-Supply line flush | 8/18/2005 | 8/19/2005 | 8/19/2005 12:14:57 PM | A | PASS |
|
|
Underground hydro and flush passed.. Piping ok to cover.
|
BLD05-00347
| FIRE-Final Inspection | 8/19/2005 | 8/19/2005 | 8/19/2005 11:45:13 AM | P | PART |
|
|
A temporary occupancy was given with Jennifer's permission until all items on the correction notice have been corrected.
|
FIR05-00356
| INSP-Final Inspection | 8/19/2005 | 8/19/2005 | 8/19/2005 11:44:53 AM | P | PART |
|
|
A temporary occupancy was given with Jennifer's permission until all items on the correction notice have been corrected.
|
BLD05-00236
| FIRE-Final Inspection | 8/19/2005 | 8/19/2005 | 8/19/2005 10:39:24 AM | P | CANC |
|
|
jamal; Phone #: ###-####
|
BLD05-00979
| FIRE-Final Inspection | 8/18/2005 | 8/19/2005 | 8/19/2005 9:38:43 AM | A | PASS |
|
|
Fire life safety finaled
|
BLD05-00347
| FIRE-Final Inspection | 8/18/2005 | 8/19/2005 | 8/19/2005 8:56:21 AM | A | FAIL |
|
|
Resubmit building plans showing fencing, gates and storage layout for review of the exiting ussues not previously shown on plans. The warehouse area has racks and storage shelves. The top shelf of the racks is at 10'-10". The top of the storage is at 15'-5" and appears to be encapsulated. The top shelf of the storage shelf's is at 8'-9" with the top of the storage at 10'-5 1/2". The storage for both shelfing systems consists of document boxes. Provide annual inspection for the fire extinguishers, provide documentation that the exit signs and exit discharge lighting can be combined and resubmit fire alarm plans/change map at annunciator.
|
FIR05-00478
| INSP-Final Inspection | 8/19/2005 | 8/19/2005 | 8/19/2005 12:00:00 AM | P | PASS |
|
|
Fire sprinkler permit finaled. Piping ok to cover.
|
FIR05-00103
| INSP-Final Inspection | 8/19/2005 | 8/19/2005 | 8/19/2005 12:00:00 AM | P | PASS |
|
|
Permit finaled
|
FIR05-00217
| INSP-Final Inspection | 8/19/2005 | 8/19/2005 | 8/19/2005 12:00:00 AM | P | FAIL |
|
|